Effectiveness of Computers in Construction Execution
Although the effectiveness of computers in construction control during execution has been shown in several case studies, their use is largely made for planning functions. Also, their use...

Real-Time Project Tracking
Too often project tracking is based on a job costing program which charges costs to the project based upon invoices from vendors and payrolls of employees. The information obtained from...

Microcomputers in Construction Claims
The increase in litigation is driven primarily by economic factors. The increased use of microcomputers has followed as a direct result of the need for better information control and dissemination....

Why Not a Microcomputer at Each Construction Site?
This paper first considers some of the issues concerning when (and even whether) such an idea is practical. It then looks at how to increase the likelihood of obtaining the desired results....

Transition to Facility Management
The introduction of Computer-Aided Design and Drafting (CADD) capability into facility planning, design, construction, and management provides the capability to better generate, manage,...

Potential Misuse of Construction Scheduling Software
The advent of microcomputers, coupled together with the development of many easy to use and economical scheduling packages, has placed a very powerful tool in the hands of construction...

AEC Experience with Expert Systems in Construction
The application of expert systems in the construction industry requires the use of general-purpose computers, such as microcomputers, minicomputers, and mainframes. The use of commercial...

U.S. Army Corps Engineers Construction Contract Claims Guidance System
Researchers at the U.S. Army Construction Engineering Research Laboratory (USA-CERL) have been developing an expert system called Claims Guidance System (CGS) to provide claims analysis...

Knowledge-Based Construction Project Planning
This paper describes CONSTRUCTION PLANEX as a prototype of a knowledge-based construction process planner. CONSTRUCTION PLANEX is a knowledge-based system that generates project plans...

Integrated Automation for Site Work
Technologically, computer integration can be built around four component systems; (a) a computer system to maintain unified data and control real-time operations, (b) a metrology system...

Real-time Animation of Construction Activities
As a result of 3-D computer modeling, the availability of geometric data in an electronic form makes possible the use of computers for purely construction activities in ways that were...

Automated Position and Control Systems Using Lasers and Electromagnetic Signals
Positioning is a crucial area in the successful integration of CAD data into the construction process. This paper looks at several areas of positioning using lasers and electromagnetic...

Real-time Monitoring of Heavy Equipment in Open Pit Mines
This paper reports on a system with local intelligence to interpret on-board signals. Existing sensors, pressure switches, warning lights, relays, and on-board monitoring systems provide...

Utilizing On-Site Computer-Based Information Systems
This paper addresses the topic of data base management systems and their use by small and medium-sized construction companies. Specifically, the use of personal computer based software...

Limitation of Liability as Part of Negotiated Risk Allocation in Engineering Contracts
The use of risk allocation in design contracts has grown considerably over the past eighteen years and is now used extensively by architects and engineers. Negotiated risk allocation has...

Discussion of the Use of Multi-Design Contracts
The paper begins by defining the multi-prime contract for design services, under which there is more than one contract between design professional and owner for a single project. It then...

A Major Engineering Firm?User of the Documents
This paper contains the author's comments on the use of the Engineers Joint Contract Documents Committee (EJCDC) documents with emphasis on Engineer-Owner Agreements and on...

Arbitration's Role in Construction Disputes
The earliest arbitration idea arose when two parties to a contract were unable to agree and thereupon submitted the question to an independent party to decide the issues. Most states now...

Packaging Claims
The paper briefly discusses project records and how they may provide important information for claims, what they should contain, and packaging the claim....

Simulation for Construction Planning and Control
A prototype system was created as part of a research project for the U.S. Navy Construction Battalions (the Seabees) and has been given the acronym SEACONS (SEAbee Construction Simulation)....

 

 

 

 