Physical Hydraulic Modeling for Construction of New York State Dam Hydroelectric Project
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into four main channels as the water...
Through-Flow Analysis for Rockfill Dam Stability Evaluations
Existing rockfill dams may have spillways that are not adequate to pass the current probable maximum flood (PMF), having been designed prior to the publication of the latest Hydrometeorological...
Modernization of the Schoolfield Dam Hydroelectric Powerhouse
This case study describes the retrofitting of a turn-of-the-century powerhouse with modern turbine/generator equipment. The structure consists of numerous turbine bays separated by massive...
Rehabilitation of Dams, Spillways, and Hydroplants
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. Concerns include deterioration of original construction materials,...
Operations and Maintenance Manual for Bradley Lake Hydroelectric Project
Bradley Lake Hydroelectric Project is located on the Kenai Peninsula of Alaska. The project consists of two 63 MVA turbine-generators fed via a single 3.5-mile-long penstock. The water...
Evaluation and Rehabilitation of Clogged Drains at Concrete Gravity Dams
Studies have shown that properly spaced drains of adequate depth provide the principal means of relief from uplift pressures beneath concrete gravity dams. Drains often become encrusted...
The Unusual History of a Flowline Canal Within a Reservoir
This paper discusses the history of and remedial repairs to a flowline canal which carries water from the headwater of Lake Isabella in California to Southern California Edison Company's...
Ashton Hydroelectric Project Rehabilitation
This paper presents the project experience of rehabilitating the 70-year old Ashton power house and performing the dam design modifications to pass the increased probable maximum flood....
Development of an Eicher Screen at the Elwha Dam Hydroelectric Project
The Eicher Screen is a relatively new concept for screening juvenile fish out of hydroelectric turbine penstocks. The concept was developed by Mr. George Eicher and one was recently installed...
Hydroacoustic Evaluation of Deep and Shallow Spill as a Bypass Mechanism for Downstream Migrating Salmon at Rock Island Dam on the Columbia River
Hydroacoustic data were collected on downstream migrating juvenile salmon (Oncorhynchus spp.) during the springs of 1983 and 1984, and summer 1990 at Rock Island Dam on the Columbia River...
Numerical Methods for Simulating Debris Blockage Failures and Mudflows
This paper presents the procedures and results from an investigation to evaluate the hydraulic characteristics of mudflow events resulting from hypothetical failures of a debris blockage...
Thermal Regimes at Tailwaters of Hydroelectric Dam
Continuous temperature data were collected in the field for periods of approximately two weeks in Center Hill Tailwater. These data were analyzed to determine the warming rates and travel...
Evaluation of Embankment Erosion at TVA's Chickamauga Project
Studies were made to evaluate the extent of erosion to be expected under probable maximum flood (PMF) conditions. The erosion studies were made using the EMBANK computer program. The results...
Stepped Spillway Design for Flow Over Embankments
Many embankment dams have been identified as unable to pass their design flows without failure due to overtopping. The U.S. Bureau of Reclamation (Reclamation) is currently at the forefront...
Overtopping Flow Spillway for Baldhill Dam, Sheyenne River, North Dakota
An existing gated spillway structure for Baldhill Dam and Reservoir (Lake Ashtabula, North Dakota) is not capable of passing floods up to the probable maximum flood (PMF) without overtopping...
Overtopping Protection for A. R. Bowman Dam
Arthur R. Bowman Dam is a 245-foot-high (74.7-m) central-core rockfill dam located on the Crooked River in central Oregon. The probable maximum flood (PMF) would overtop the dam by 20...
Innovative Reregulation Weirs for Dam Releases
Two different reregulation weir designs for dam release improvement are discussed. A porous timber crib is favored for applications where increased minimum flow is needed, and a labyrinth...
Application of Appropriate Technology in Hydroelectric Project Rehabilitation
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. A primary concern is spillway and stability inadequacies resulting...
Design of High Capacity Spillways for Ritschard Dam, Colorado
A hydraulic model investigation was conducted by the Bureau of Reclamation to assist in designing the hydraulic structures associated with Ritschard Dam. Ritschard Dam will have a labyrinth...
Dam Break Analysis for a Series of Dams Using the HEC-1 and DAMBRK Computer Programs
The HEC-1 and DAMBRK computer programs were developed by the US Army Corps of Engineers, Hydrologic Engineering Center (HEC) [3] and by the National Weather Service (NWS) [4], respectively....
Return to search