Artificial Gravity: Human Factors Design Requirements
A major challenge of manned spaceflight is to assure the health, well-being and performance of the space inhabitants. As man ventures beyond Earth's orbit to settle the Moon,...

Partial Gravity: Human Impacts on Facility Design
Partial gravity affects the body differently than earth gravity and microgravity environments. The main difference from earth gravity is human locomotion; while the main difference from...

Hedratecture and Artificial Gravity
There is a need, according to the National Commission On Space, to develop three critical space facilities: A Space Base, A Variable-Gravity Research Facility, and a Lunar Surface Outpost....

Education: The Future is Now
The United States of America as a nation faces a major challenge in improving its entire educational systems, especially education in mathematics, science, and engineering. Our future...

New Interdisciplinary Engineering Design Course in Planetary Materials and Resource Utilization
A new senior/graduate-level course addressing topics of planetary materials and resource utilization was given at Michigan Technological University in the spring of '89. The...

Designed Experiments: An Interdisciplinary Approach to Space Education
The challenge of space is forcing engineering faculties to re-examine their roles in preparing college graduates to contribute to the space exploration and colonization effort. One of...

Probable Impacts of Space Operations on Air Force Civil Engineering
Consider the bridge from today's space programs and systems to tomorrow's space reality. Current space policy is revoluntionary in nature. Selected space related...

Synthesis of a Space Infrastructure
The Rockwell International 'Integrated Space Plan' consolidates a broad range of near-term and long-range objectives for the development of space. Beginning with...

Application of Statistical Distribution Theory to Launch-on-Time for Space Construction Logistic Support
The Center for Space Construction (CSC) has acquired historical launch vehicle data for analyzing space launch vehicle logistic support of space construction. This analysis will include...

Columbus Generic Element Management Concept
The concept for largely autonomous onboard management of the ESA Columbus project elements relies on the automation of operational procedures. Reconfigurable items are commanded in sequence...

Normal Accidents and Logistics in Space Operations
Unpredictable systemic accidents, normal accidents, will occur in highly-complex large-scale space systems. To mitigate the catastrophic consequences of normal accidents, containment engineering...

DYCAM: A Computer Aided Engineering Tool for Space Construction Planning
Planning and management of construction activities in space have not received sufficient attention up to the present. Space Station Freedom, a number of large platforms and extraterrestrial...

The Selection of Constructors for Space Construction
The process of space construction is defined by the construction goal and by the construction system selected to accomplish that goal. The goal provides the tasks that must be executed,...

A Language Model for Space Construction Control
The optimal construction system for many space construction projects is a mixed construction ensemble. Such an ensemble consists of humans, robots with varying degrees of teleoperation...

A Cost Study of Concrete Production on the Moon
In proposing and evaluating a construction system for a lunar base, the question of cost would be the most important one. Although it is not possible to conduct a detailed cost study at...

Level of Recycling Effectiveness
The Level Of Recycling Effectiveness (LORE) scale is presented. It is a conceptual framework for evaluating recycling and other alternative strategies of meeting needs in space activities....

Encouraging Students to Enter Math, Science, and Space-related Fields
Most people agree that education is the key to technological superiority, that our current state of education is prohibiting the United States from being as competitive as it once was,...

Creatively Cost Sharing a Large Flood Control Dam
The passage of Public Law 99-662 in November of 1986, commonly known as the Water Resources Development Act of 1986, added a new dimension to Federal development of water resource projects....

Balancing Needs: Growth & Infrastructure Rehabilitation
Long range planning must include more than construction of facilities to meet new demands for service. A conscious effort must be made to balance the need for additional facilities with...

Urban Drainage Pipe Systems: Failure Diagnosis and Rehabilitation Planning
A Task Committee on Failure Diagnosis and Rehabilitation of Urban Drainage Infrastructure has been organized by the Urban Water Resorces Committee of the Water Resourcs Planning and Management...

 

 

 

 

Return to search