The Development and Writing of the ASCE Manual of Practice for Steel Penstocks
The 'Manual of Practice for Steel Penstocks' is being written under the supervision of the Hydropower Committee of the ASCE Energy Division. The committee felt...

Relationship Between Lysimeter Area and Evapotranspiration (ET)
The lysimeter is an important instrument for measuring evapotranspiration (ET) of crops. It is widely used in the irrigation and drainage experimental stations in China. However, the areas...

An Overview of EPRI Hydrogeochemical Code FASTCHEMTM
The capabilities of the flow and transport modules that make up FASTCHEM are described. The linkages among the various modules that are required to achieve a hydrogeochemical analysis...

Bridge Inspections Related to Bridge Scour
The failure of the Silver Bridge over the Ohio River in Point Pleasant, West Virginia, on December 15, 1967 resulted in the establishment of the National Bridge Inspection Standards (NBIS)...

Introduction, and Analysis of Survey?Preliminary Report of Task Committee on Recommendations for Standards in Hydraulics
To help formulate its recommendations for future standardization of tasks in hydraulic engineering, the Task Committee conducted a survey of practicing engineers. This survey indicated...

Existing U.S. Standards in Hydraulic Engineering
The Task Committee on Recommendations for Standards in Hydraulics confined itself to topics that are used in hydraulic computations or design. Thus numerous standards related to size,...

Foreign Hydraulic Standards and Guidelines
Standardization in Europe is propelled by the incentive to achieve harmonization of design, testing, inspection and certification methods for an internal market among eighteen European...

Preliminary Recommendations from the Task Committee on Standards in Hydraulics
The Task Committee on Standards in Hydraulics has been given the responsibility of recommending whether or not the American Society of Civil Engineers (ASCE) should formulate standards...

A Microcomputer-Based System for Two-Dimensional Flow Modeling
An integrated, microcomputer-based system has been developed for simulation of two-dimensional, unsteady, free surface flows. The system consists of a finite-element mesh generation code,...

The Benefits of U.K. Guidance for Temporary Works
In British contracts the Contractor is responsible for the design and execution of temporary works unless the Design Engineer or the Client expressly instruct how the work is to be undertaken...

Current Legal Issues Impacting Temporary Works in Construction
There are two evolving areas of legal concern to the engineer and contractor involved in any aspect of temporary construction. The interpretation and application of the Occupational Safety...

FHWA'S Bridge Temporary Works Research Program
The Federal Highway Administration (FHWA) has developed a research program to address bridge falsework design and construction. This resulted from the collapse of the Route 198 bridge...

Development of Standards for Slipform & Jumpform Works
Review of past work indicates substantial effort has been made to publish construction standards and guidelines for slipforms but published material pertaining to jumpforms is scarce....

Laboratory and Field Research in Construction Automation
This paper presents a series of research projects to build and test prototype systems. It has been found that prototyping provides an economical approach to support both basic and applied...

Contractor Sponsored Expert System
An expert system being developed for a general building contractor for generating draft schedules for high-rise residential construction is described. Use is made of standard projects,...

Computer Data Exchange Using National and International Standards
There is a need within the construction industry to electronically transmit standard documents between designers, owners, contractors, and material suppliers. Ideally, the transmission...

Negotiations: How do You Measure Success?
Negotiating a 'successful' outcome once a dispute has arisen is often more difficult than negotiating agreement prior to the emergence of conflict. The basic...

Hurricane Hugo One Year Later
Hurricane Hugo, which made landfall on September 21, 1989, was the first serious storm to cross the South Carolina coast in over 30 years. During this period, the coastal areas had grown...

Spectral Shapes and Amplifications for the Loma Prieta Earthquake of October 17, 1989
The 1971 San Fernando earthquake provided engineers and seismologists with the largest number of strong motion accelerograms ever recorded for an earthquake at that time. Those records...

Performance Specifications for Floating Docks
The paper reflects the lessons learned by the writer thru involvement with the floating dock industry since the middle 1960's as both a manufacturer and a consultant. Sections...

 

 

 

 