Station Design for Vancouver ALRT
An overview of the fifteen stations in the first phase of Vancouver's new automated light rail transit system is provided. Decisions related to station locations and types,...
Safety Aspects of Detroit DPM Station Designs
The Detroit Downtown People Mover (DDPM), currently under construction in the Central Business District of downtown Detroit, offered a unique set of challenges to the architects and engineers...
Design and Fabrication of the Guideway Superstructure for the Miami METROMOVER
The guideways for the driverless rubber-tired vehicles are entirely aerial. As a result of severe restrictions on horizontal alignment and pier locations imposed by the downtown Miami...
Design of Guideway Substructure Dada County METROMOVER
This paper describes the procedures and parameters used for the design of the guideway substructure for the Dade County METROMOVER system. The substructure for this work is defined to...
Summary Evaluation of Dade County's APM Foundations
This paper presents an overview of the engineering performance and cost effectiveness of the guideway and station foundations of Dade County's Automated People Mover (APM)....
Unique Considerations in the Detroit DPM Foundation Design
Foundation design for the guideway of Detroit's Downtown People Mover (DPM) was influenced by a variety of unique considerations. Severe loading conditions were created by...
Design and Construction of Guideway: Vancouver Advanced Light Rapid Transit
The Vancouver Advanced Light Rapid Transit (ALRT), system consists of linear induction motor driven, light-weight cars automatically controlled operating over a 21. 4 km system from downtown...
Alignment Special Structures for Vancouver's ALRT
This paper describes the special long-span structures, offset columns, and bent structures used in situations where the standardized guideway components used in over 90 percent of the...
Production of Guideway Beams for the Vancouver ALRT
This paper describes the planning, layout and design of a large scale precast plant and innovations in production technology for the fabrication and delivery of 1040 tangent and curved,...
Guideway Beams?Formwork and Fabrication
A manufacturing concept was developed around an adjustable form capable of mass producing prestressed concrete beams to the unique geometric configuration of each section of track. The...
Downtown People Mover System Security: Detroit and Miami Responses
The Detroit and Miami downtown people mover (DPM) systems will be in uncontrolled environments in major urban central business districts. Both plan not to have personnel on vehicles or...
Human Interface Design of an APM Control Center
The control center of an Automated People Mover (APM) system is a man-machine system. Both software and hardware aspects of the design of the monitor room that directly affect ease of...
Detroit's DPM Maintenance and Control Facility
The Maintenance and Control Facility (MCF), a single building complex for the Detroit Downtown People Mover (DPM) system, incorporates the people mover system's transit vehicle...
Downtown People Mover Operating and Maintenance Personnel Requirements
Two major automated Downtown People Mover (DPM) projects, Miami and Detroit, are expected to be in operation within a year. These two DPM systems are similar in many respects: automation,...
Maintenance Requirements of People Mover Systems
The Atlanta Airport Automated Guideway Transit System is comparable to the second or third busiest transit line in the US. The key quality indicators of system performance are discussed...
AIRTRANS System Maintenance
This paper addresses AIRTRANS, and in particular, its maintenance organization, facilities, tasks and methodologies. Recognizing that other automated people movers (APM's)...
Toward User-Oriented Failure Management Strategies for the Morgantown People Mover
The Morgantown People Mover (MPM) is the most sophisticated automated people movers in the United States. It is the only one that offers 'personalized' service...
A Methodology for Forecasting APM Operation and Maintenance Trends Using Existing Experience
Operation and Maintenance responsibility for the Morgantown, West Virginia Automated People Mover (APM) was assumed by West Virginia University some nine years ago. The experience of the...
The WMATA Resident Engineer?The Team He Leads and His Responsibilities
This paper discusses the role of the Resident Engineer as a key member of any construction team. It uses the organization and functions as practiced at the Washington Metropolitan Area...
Drainage Tunnels Save Freeway Link
A 15 mile section through downtown Phoenix will complete Interstate 10. After years of delay, the project is now close to completion. The project required construction of 6.5 miles of...