A Synthetic Simulation Model of Storm Surge History and Inland Drainage in Coastal Zone Areas
In this paper, a synthetic storm surge model is proposed. With the input information of peak surge height, storm duration, and shape coefficients, this model is capable of simulating most...

Low-Land Hydraulics and Hydrodynamics
A hydrodynamic model is presented for simulation of wetland hydrodynamics. The model incorporates all elements of the hydrologic cycle, such as precipitation, runoff, groundwater seepage...

Santa Ana River Project Overview
The Santa Ana River Project, authorized for construction by the Water Resources Development Act of 1986, is designed to provide urban flow protection to the growing communities in Orange,...

Extraction of Terrain Features from Digital Elevation Models
Digital elevation models (DEMs) are being used to determine variable inputs for hydrologic models in the Delaware River basin. Recently developed software for analysis of DEMs has been...

Geographic Information System/Watershed Model Interface
Geographic information systems allow for the interactive analysis of spatial data related to water-resources investigations. A conceptual design for an interface between a geographic information...

Interfacing Geographic Information System Data with Real-Time Hydrologic Forecasting Models
This paper discusses a plan to incorporate remotely sensed spatial data into a real time hydrologic decision support system. Because of the nature of the hydrologic forecasting system,...

The Illinois GIS and Hydrologic Database
Development of the Illinois Geographic Information System (GIS) from 1983 to the present is described including the hardware configuration and ARC/INFO software. The database design at...

Risk Assessment of System of Dams
The application of risk assessment to a series of dams on a river is presented here. A general discussion of the basic principles of risk assessment approach to dam engineering is given...

Elements of a Coastal Stormwater Drainage System
Several elements in the design of a stormwater drainage system that outfalls to the ocean are discussed. The paper discusses a study conducted of the Ocean Lakes Watershed near Myrtle...

Evaluation of TR-55 on Coastal Watersheds
Results of a study of the applicability of TR-55 to coastal watersheds are presented. Historical data were used to evaluate curve number, time of concentration and unit hydrograph peak...

Status of Hydropower Development at Corps of Engineers Dams
The Corps of Engineers is the largest single supplier of hydroelectric power in the United States with 74 projects and an installed capacity of 20,839 MW. In addition, 33 Corps projects...

The Development and Writing of the ASCE/EPRI Hydroelectric Guidelines
In the Spring of 1989, the American Society of Civil Engineers (ASCE) and the Electric Power Research Institute (EPRI) jointly published their Civil Engineering Guidelines for Planning...

Rule Curve Operation at Terzaghi Dam to Pass the Probable Maximum Flood
Terzaghi dam is located on the Bridge River, a tributary of the Fraser River. The spillway was originally designed for the 1000-year flood. Probable Maximum Flood (PMF) studies completed...

Hydrometric Networks Serving Hydropower Needs
The Water Resources Branch is the national agency that collects, interprets and disseminates standardized surface water quantity and sediment data and information in Canada. The Branch...

Hydraulic Model Tests of Flow around Penstock Suspended inside the Tunnel for Design of a Small Hydro
The proposed hydropower project in the State of Virginia involves design and construction of a steel penstock hung from the crown of an existing outlet tunnel at this U.S. Army Corps of...

New Clues to PMP
Great changes have occurred in meterology in the last two decades. Formerly, weather data were available for forecasting and climatological analyses only at points - at weather stations....

Computerized Measurement of Turbine Flow and Performance, Including Penstock Protection
The application of computer technology now makes it possible to measure turbine flows accurately, reliably and economically. The measurement is based on the differential pressure produced...

Capital Cost Modelling for Micro-Hydro Appraisal
Empirical capital cost models for mini- and micro-hydro installations have not been validated with consistent site information. This paper reviews cost modelling techniques and describes...

Electrical and Mechanical Design, Commissioning, and Performance of the Moose River Hydroelectric Project
The Moose River Hydroelectric Project is a single-unit run-of-river hydroelectric facility located near Lyonsdale, New York, and was developed by a private firm. The generating equipment...

Efficiency Monitoring Yields Large Revenue Gains
This paper presents a Washington Water Power Company program to increase hydroelectric plant operations' efficiency. This increase is due to improved flow, head, and megawatt...

 

 

 

 