Development of Three Systems Operated Rev. Pump Turbine
In order to represent the development of reversible, single stage pump turbines in Yugoslavia, the three systems operated pump turbine (3SRPT) of the fourth unit of Moste hydro power plant,...

Computer Aided Design of Butterfly Inlet Valves
Computer simulation of butterfly inlet valves (throughflow, lattice) in hydropower schemes is presented. The software is intended for practisting engineers to obtain significant parameters...

Synchronous Bypass Valves for Hydroplants
The requirement that synchronous bypass valves be provided on most hydroplants and the high cost of suitable valves have created a demand for rebuilt valves. Recently, the Bureau of Reclamation...

Turbine Efficiency Monitoring Utilizing Ultrasonic Flowrate Measurement
On-line turbine efficiency measurement can be achieved by ultrasonic flowrate measurement and state-of-the-art data acquisition techniques. A field performance test program conducted at...

Field Testing: Producing Complete Test Results on Site, A Realistic Objective
Modern technologies and instruments have had an influence in nearly every field imaginable. At Hydro-Quebec, the last ten years have brought about a complete transformation in the way...

Basic Considerations in Governed or Non-Governed Small Hydro Power Plants
This paper reviews the necessary studies and major considerations that must be completed for proper coordination and selection of a turbine governor, and generator. A discussion of the...

Design and Commissioning of the Philadelphia Hydroelectric Project
The Philadelphia Hydroelectric Project consists of a single horizontal-shaft double-regulated S-type unit, rated 3440 kW, utilizing a programmable controller for unit operation together...

Programmable mMicroprocessors in Local Control of Hydro Power Plants
The main purpose of the control equipment is to provide the generator with means for operation of the power station equipment. There is a need for status information on the generating...

An Integrated Site Controller-Network Monitoring System for Small Scale Hydroelectric Sites
Over the past decade more and more small scale hydroelectric power developers have faced the question of the economic feasibility of installing microprocessor based control systems for...

Efficiency in Auxiliary Electrical Systems
In 1984, during the preliminary design for the proposed second powerhouse at the Corps of Engineers' McNary Dam on the Columbia River, the more recent improvements and techniques...

Grand Coulee SCADA System Procurement
Purchasing a quality Supervisory Control and Data Acquisition (SCADA) or Energy Control System (ECS) at a reasonable price for a particular installation can be a challenging undertaking....

The Design and Operating Experience of a Multiplexer Application in Conventional Hydro Powerhouse Control
The design of the Bonneville Second Powerhouse control system presented an opportunity to replace conventional cables with a multiplexer system that would provide a two-way data communication...

Capabilities of Automated Control System Employing Advanced Programmable Controllers
This paper details Voith Hydro's range of experience in the use of Programmable Logic Controllers (P. L. C. 's) in the automation of new hydro electric sites....

Integrated Automatic Hydroelectric Plant Control
The increased acceptance and employment of microcomputers to control specific functions in small hydroelectric plants has led to computerized integrated total control of hydropower generation....

Electrical Equipment for Pumped Storage Plants
Selection of generator/motors and other electrical equipment for pumped storage plants requires consideration significantly different than for conventional hydro plants. This is particularly...

Influence of Surface Finish on Thrust Bearing Life
The original pivoted pad thrust bearing installed and fitted at the Holtwood Power Station in 1912 by A. Kingsbury has been operating continuously since that time without any difficulty....

What is Wrong with our Hydro Generators?
A number of studies have already been presented on the refurbishment and modernization of hydro facilities and also the design and upgrading of the generators. This paper will partly deal...

McNary Powerhouse Generating Unit 14 Stator Core and Winding Replacement
The powerhouse contains 14 main generating Kaplan-blade units, each rated at 73,684 kVA at 0. 95 power factor. In early 1985 the decision to rewind and uprate Unit 14 was being finalized....

Hydropower in the Kodiak National Wildlife Refuge
The Terror Lake Hydroelectric Project is unique in that it is the only energy project to be constructed in a National Wildlife refuge. A National Wildlife Refuge has few equals to blocking...

The Stanley Canyon Conduit Hydroelectric Project
The Stanley Canyon Hydroelectric Project is an excellent example of the maximum use of a natural resource. The project is a combined water supply and hydroelectric facility which received...

 

 

 

 