Quick Stroking: A Fast and Accurate Algorithm for Time-Optimal Valve Closure Synthesis
In this paper, a fast, simple, yet effective technique for valve motion synthesis is developed. This technique called Quick Stroking is applied to a practical example problem, and it may...
SWRRB.80: A Basin Scale Model for Microcomputers
The SWRRB (Simulator for Water Resources on Rural Basins) model was developed by the USDA Agricultural Research Service to simulate the daily stream flow, and sediment loads from agricultural...
Cazenovia Creek Model Data Acquisition System
The purpose of the model is to reproduce river ice breakup phenomena for optimizing the design of an ice control structure. The performance of the ice control structure during a simulated...
Data Acquisition and Control for Hydraulic Models
The Waterways Experiment Station is expanding the use of computer controlled data acquisition and control equipment on a variety of hydraulic models. These systems are presently being...
Littoral Environment Observation Program
This paper presents a method for determining the longitudinal, transverse, and vertical dispersivities of a thick aquifer for a free convection tracer test using only measurements from...
Role of Small Computers in Two-Dimensional Flow Modeling
This paper describes the computational aspects and computer usage history of numerical simulations of horizontal, free surface, steady or unsteady two-dimensional flow fields. The focus...
A Unique Communication System for Aerial Ropeways
The basic principles of operation of a Double Reversible Aerial Tramway are introduced. A brief note is given explaining a safety circuit or survey current used on the haul rope, since...
The Planning of an Automated Rapid Transit System in Vancouver
BC Transit is building a 13 mile (22 km) rapid transit line in Vancouver that incorporates Heavy Rapid Transit, Light Rapid Transit and Automated People Mover concepts. The bus sized lightweight...
Kobe New Transit System Portliner experience of Unmanned Operation
The Kobe New Transit System 'Portliner' is the first automated people mover which achieved the fully automated unmanned operation as a public transportation system...
Cable Propelled People-Movers?An Idea Whose Time Has Come Again
Cable-propelled transportation systems have been in use throughout the world for more than a century. Today, a completely automated cable-propelled transit system has been developed through...
The H-Bahn, a Fully Automatic People Mover System
The H-Bahn suspended cabin system is the contribution of the Siemens - DUEWAG joint development venture towards solving the problem of economical public transportation. This track-bound...
Unique Features of Automated People Mover Systems
This paper identifies the characteristics and unique features of the automated transit system presently being installed in the central business district of Detroit, Michigan. This system...
Human Interface Design of an APM Control Center
The control center of an Automated People Mover (APM) system is a man-machine system. Both software and hardware aspects of the design of the monitor room that directly affect ease of...
Detroit's DPM Maintenance and Control Facility
The Maintenance and Control Facility (MCF), a single building complex for the Detroit Downtown People Mover (DPM) system, incorporates the people mover system's transit vehicle...
Alternative Procedures for Investigating Failures
Failures of engineered structures continue to occur. This is despite rapid advances in engineering theory, new, more sophisticated methods of analysis, and streamlined techniques for preparing...
Failure Information Needs in Civil Engineering
If we are to learn from failures of engineered facilities, failure information must be in a useful form, and it must reach those who can effect improved practice. This paper discusses,...
Ensuring Quality Construction
This paper describes the US Army Corps of Engineers' efforts at procuring quality construction: 1) a three-phase approach (preparatory, initial, follow-up) was developed to...
Hydropower's Newest Generation
Higher energy prices and strong incentives from the federal government have caused hydropower developers to consider sites that just a few years ago were scoffed at as mere trickles. Intense...
Avoiding Disputes: The Construction Manager's View
Avoiding and minimizing contract disputes, from the construction manager's (CM) point of view, begins during the preliminary planning and design stages and continues throughout...
Construction Inspection?The Last Line of Defense
Construction inspection, or a quality assurance program, is typically the last line of defense in relation to claims for the constructed project. The quality assurance team should be a...
Return to search