Bank Failure and Erosion on the Illinois Waterway
In 1988, bank failure and erosion on the Illinois Waterway were evaluated. Banks were inspected from the air and from a motor vessel; thirty-one sites were examined in detail. Severe erosion...
Earthquake Effect on Sediment in Rivers and Deltas
Many authors have studied the age and distribution of the Holocene deltaic deposits of the Mississippi River. Several others have written about the magnitude and the recurrence interval...
Cold Regions Engineering
This volume contains papers that were presented at the 5th International Cold Regions Engineering Specialty Conference, sponsored by ASCE and held in St. Paul, Minnesota, February 6-8,...
Compendium of International Ocean Energy Activities
This
Bullwinkle
The 1989 Outstanding Civil Engineering Achievement is an offshore oil production platform named Bullwinkle, a structure in the Gulf of Mexico that is taller than the Sears Tower, shaped...
Award for an A-Frame
The Waddell A-frame truss bridge that now stands in Parkville, Mo. was neither the longest, largest nor most all-encompassing civil engineering project of 1988. But the story behind the...
Geotechnical Aspects of River Bank Erosion
The principal geotechnical mechanisms of river bank failure are identified on the basis of extensive field investigations on many different river systems. The role of each factor depends...
Control of Bank Erosion in The Netherlands. State-of-the-art
In the Netherlands the protection against flooding and the effects of inland navigation have always been extremely important. Many problems related to these items, among them erosion and...
Design, Construction and Testing of Repairs to the Low Level Outlets at Terzaghi Dam
Operation of the low level outlets (LLOs) at Terzaghi Dam in southwestern British Columbia resulted in severe cavitation at operating heads significantly lower than design. Modifications...
GEOPACK: A Geostatistical Software System
A comprehensive, user-friendly geostatistical software system called GEOPACK has been developed. The purpose of this software is to make available the programs necessary to undertake a...
Risk Assessment of System of Dams
The application of risk assessment to a series of dams on a river is presented here. A general discussion of the basic principles of risk assessment approach to dam engineering is given...
Elements of a Coastal Stormwater Drainage System
Several elements in the design of a stormwater drainage system that outfalls to the ocean are discussed. The paper discusses a study conducted of the Ocean Lakes Watershed near Myrtle...
Status of Hydropower Development at Corps of Engineers Dams
The Corps of Engineers is the largest single supplier of hydroelectric power in the United States with 74 projects and an installed capacity of 20,839 MW. In addition, 33 Corps projects...
The Development and Writing of the ASCE/EPRI Hydroelectric Guidelines
In the Spring of 1989, the American Society of Civil Engineers (ASCE) and the Electric Power Research Institute (EPRI) jointly published their Civil Engineering Guidelines for Planning...
Rule Curve Operation at Terzaghi Dam to Pass the Probable Maximum Flood
Terzaghi dam is located on the Bridge River, a tributary of the Fraser River. The spillway was originally designed for the 1000-year flood. Probable Maximum Flood (PMF) studies completed...
Computerized Measurement of Turbine Flow and Performance, Including Penstock Protection
The application of computer technology now makes it possible to measure turbine flows accurately, reliably and economically. The measurement is based on the differential pressure produced...
Electrical and Mechanical Design, Commissioning, and Performance of the Moose River Hydroelectric Project
The Moose River Hydroelectric Project is a single-unit run-of-river hydroelectric facility located near Lyonsdale, New York, and was developed by a private firm. The generating equipment...
Replacement of Computer Control at John Day Powerhouse
One of the first projects chosen by the Corps of Engineers for computer control was the John Day Project on the Columbia River. John Day powerhouse was completed in 1971 and has 16 generators...
Programmable Logic Controller Based Governor/Plant Controller
This paper discusses the performance characteristics of the programmable logic controllers (PLC's) is based governor, particularly speed resolution and response times. The...
Design Data of Kaplan and Bulb Turbine Units
Some basic statistical data covering geometrical and energy parameters for Kaplan and bulb turbine units are presented. These data are further compared as specific rations for both units,...
Return to search