The Electric Consumers Protection Act of 1986 Changes FERC Hydropower Licensing
The Electric Consumers Protection Act of 1986 (ECPA) was signed into law on October 16, 1986. This legislation revised and created new ground rules for the processing of hydropower license...

The New Environmental Requirements of ECPA
The Electric Consumers Protection Act of 1986 ('ECPA') has imposed significant new environmental criteria on the hydroelectric licensing process under Part I...

Hydro Activities Through the 1990's: Focus on Relicensing
This paper discusses some of the more significant issues facing relicensing applicants in light of the new ECPA amendments to the Federal Power Act (FPA). In addition, some ideas for planning...

Issues in License Compliance and Monitoring
With the language in Section 12 of the Electric Consumers Protection Act ('ECPA') of 1986 (now Section 31 of the Federal Power Act), Congress gave the Federal...

Case Study on the Development of a Hydro License Compliance Monitoring System
As the holder of 29 Federal Energy Regulatory Commission (FERC) licenses, Pacific Gas and Electric Company (PGandE) has an obvious need to monitor and document compliance with the numerous...

Impact of Annual Repayment on Efficient Use of Power Revenues
Congressional efforts to control Federal budget deficits are leading to new requirements for fixed annual repayment of investment in power and irrigation facilities. Traditionally, investments...

Pumped Storage and Power System Operations
The 2100 megawatt Bath County pumped storage power station began commercial operation in December 1985 as a jointly-owned project of Virginia Electric and Power Company (Virginia Power)...

Appropriate Design and Construction of Conduits for Small and Mini Hydropower
The success of smaller hydro schemes often lies in identifying feasible and economic waterway systems to develop relatively high heads between low intake weir and powerstation. This paper...

The Design of the Outlet for the New Koepchenwerk Pumpstorage Plant
The Koepchenwerk Pumpstorage Plant (1930) is going to be replaced by a new plant with a 150 MW Pumpturbine in a shaft. This paper explains the reasons for this replacement and gives a...

Rock Engineering at Cat Arm Hydroelectric Development
Cat Arm Hydroelectric Development in Newfoundland, Canada, develops 129 MW from 384 m of head. The project was constructed between 1981 and 1984 and comprises 5 large dams, 5 small dams,...

Bath County Tunnel System/Remedial Treatment Program
The Bath County Pumped Storage Project, owned jointly by Virginia Electric and Power Company and Allegheny Generating Company, is located 70 miles (112 km) north of Roanoke, Virginia....

Geotechnical Exploration?Rio Bravo Hydro Project
In order for the Rio Bravo Hydroelectric Project to become a reality, a thorough evaluation of alternative project configurations was necessary. Various power canal shapes, sizes, and...

Variable Speed Generators in Hydro Applications
This paper discusses the investigation of the doubly-fed variable speed machine as a potential candidate to convert a varying input speed to a constant frequency, constant voltage output....

Research and Development Program on Small Scale and Low Head Hydro by the Canadian Government
In July 1985 the Canadian Department of Energy, Mines and Resources (EMR) was assigned the responsibility for the federal support program for renewable energy R&D in Canada. In...

Calculation of Blade Trunnion Reactions in Kaplan Turbines
A computer program is presented to calculate the blade trunnion reactions in Kaplan turbines. The program calculates the trunnion reactions for operation of the turbine at steady state...

The Design of the Nanpil River Hydropower Project
In 1980, the State of Pohnpei (then spelled Ponape) asked the Pacific Ocean Division of the U. S. Army Corps of Engineers to investigate the feasibility of constructing a hydroelectric...

Synopsis of Harry S. Truman Turbine Repair
The Harry S. Truman Powerplant was designed and constructed under the supervision of the U. S. Army Corps of Engineers and is located on the Osage River near Warsaw, Missouri. During 1981...

Development of Three Systems Operated Rev. Pump Turbine
In order to represent the development of reversible, single stage pump turbines in Yugoslavia, the three systems operated pump turbine (3SRPT) of the fourth unit of Moste hydro power plant,...

Experimental Investigation of the Cross Flow Turbine
A laboratory model of the Cross Flow Turbine was investigated in the Hydraulics laboratory of Colorado State University. Because of the successful use of this turbine in the developing...

Programmable mMicroprocessors in Local Control of Hydro Power Plants
The main purpose of the control equipment is to provide the generator with means for operation of the power station equipment. There is a need for status information on the generating...

 

 

 

 

Return to search