The Cougar Project?Turbine Runner Replacement
The Cougar turbine runners have been subjected to a substantial amount of cavitation damage which has required repair by welding. The continued welding repair has subsequently resulted...
Economic Evaluation of Replacement Turbine Runner Bids
Many owners of hydro facilities are investigating increasing plant capacity and output by upgrading existing hydraulic turbines. Typically, the owner will conduct a detailed feasibility...
Potential for Upgrading the Robert Moses Niagara Power Plant
This paper summarizes the feasibility of increasing the generating capacity of the Robert Moses Niagara Power Plant by replacing the turbine runners, upgrading the generators, and replacing...
Major Hydraulic Turbine Operation and Maintenance Problems Experienced by the Corps of Engineers
The U. S. Army Corps of Engineers is the largest owner/operator of hydroelectric power generating facilities in the United States with 344 generating units, having an installed capacity...
Synopsis of Harry S. Truman Turbine Repair
The Harry S. Truman Powerplant was designed and constructed under the supervision of the U. S. Army Corps of Engineers and is located on the Osage River near Warsaw, Missouri. During 1981...
An Analysis of Cavitation Damage in a Francis Turbine Operating Under Small Opening Condition
In this paper some new formulae are derived to estimate the pressure and the relative velocities in the crown and the band regions of the Francis turbine runner operating under any gate...
Field Observations of Cavitation Erosion in Hydraulic Turbines
Field surveys of the operational and design characteristics of 602 hydroturbines installed since 1950 and having a capacity in excess of 20 MW or a discharge diameter greater than 3 meters...
Racine?5 Years of Successful Operating Experience with the World's Largest Bulb Turbines
In September 1982 two bulb turbine generating sets with a runner diameter of 7700 mm and a generator rating of 25 MVA were put into commercial operation at the Racine dam on the Ohio river....
Development of Three Systems Operated Rev. Pump Turbine
In order to represent the development of reversible, single stage pump turbines in Yugoslavia, the three systems operated pump turbine (3SRPT) of the fourth unit of Moste hydro power plant,...
Competitive Model Testing for Replacement Runners at the Wells Hydroelectric Project
The Wells Hydroelectric Project, located on the Columbia River, contains ten Kaplan-type turbines, each rated at 123,000 HP (91,720 kW) at a net head of 64. 9 ft. (19. 8m). The plant has...
Independent Turbine Testing and Research
The St. Anthony Falls Hydraulic Laboratory (SAFHL) is presently upgrading their Turbine Test Facility. Completion of the upgrade, including checkout tests, is scheduled for Fall 1987....
Index Testing With a Data Acquisition and Control System
A computer controlled index test has been developed that can be used to optimize blade-gate relationships on adjustable blade (Kaplan) hydraulic turbines. This paper includes hardware...
Experimental Investigation of the Cross Flow Turbine
A laboratory model of the Cross Flow Turbine was investigated in the Hydraulics laboratory of Colorado State University. Because of the successful use of this turbine in the developing...
Digital Control of 180MW Francis Turbines: Controller Design, Simulation, and Operational Results
The features of a new hydro-power station are outlined as are some specifications that the customer required of a digital controller. Both hardware and software aspects of this recently...
Programmable mMicroprocessors in Local Control of Hydro Power Plants
The main purpose of the control equipment is to provide the generator with means for operation of the power station equipment. There is a need for status information on the generating...
Kaplan Blade Angle Controller
This paper describes a recently developed computerized Kaplan blade angle controller that is capable of improving turbine performance. Model Tests or Index Tests produce the Three-D-Cam...
Voltage Versus Var/Power Factor Regulation on Hydro Generators
When paralleled to the utility bus, synchronous generators can be controlled using either terminal voltage or var/power factor regulation. Selection is dependent upon the size of the generator...
Influence of Surface Finish on Thrust Bearing Life
The original pivoted pad thrust bearing installed and fitted at the Holtwood Power Station in 1912 by A. Kingsbury has been operating continuously since that time without any difficulty....
McNary Powerhouse Generating Unit 14 Stator Core and Winding Replacement
The powerhouse contains 14 main generating Kaplan-blade units, each rated at 73,684 kVA at 0. 95 power factor. In early 1985 the decision to rewind and uprate Unit 14 was being finalized....
Design Improvements on a Small Hydro Project
The Whiskeytown Hydroelectric Project, built for the City of Redding, California, provides an excellent example of the type of improvements in general arrangement which can be achieved...
Return to search