World Class Manufacturing and Hydro-Electric Production
Operations, maintenance, and administration and support services can benefit from the concepts of World Class Manufacturing. Cellular organizational concepts whether its machines, people,...
Trashrack Cleaning?A Job Requiring Utmost Care
During the last few years, the tendency in most industries has been towards more automation. Hydro has been no exception. Trashrack raking machines have followed this trend, and automatic...
Upgrading Trashraking Equipment During Scheduled Maintenance Outages
Four small hydro plants in Northern California were selected by Pacific Gas and Electric Company to upgrade and automate their trashrack raking equipment during the 1988 maintenance outages....
Management System for Power Plants Tecaid Maintenance System
Operational conditions and production levels are maintained at consistently higher levels when a planned maintenance system is used. Initial operational expenses for a planned maintenance...
Underwater Tunnel Inspection by Virginia Power Using a Submersible Robot
The Bath County Pumped Storage Station, jointly owned by Virginia Power and Allegheny Power systems and operated by Virginia Power, has three large tunnels linking the upper and lower...
Challenging Site Conditions Lead to Unusual and Innovative Powerhouse Design Features
Pacific Gas & Electric Company's recently completed Newcastle Powerhouse is located on the shore of Folsom Lake near Auburn, California. The $26 million facility uses...
Intake Towers and Outlet Tunnels Adapted for Hydro
An intensive design project was undertaken with the objective of retrofitting two U.S. Army Corps of Engineers (COE) dam sites for hydroelectric power generation. The challenge of designing...
Design and Construction of the Moose River Hydroelectric Project
The project's main features are: a 7 ft high, 240 ft long cast-in-place concrete overflow weir; bell mouth entrance concrete intake structure with trashrack and trashrake;...
Lopez-Angostura Power Tunnel
The Lopez-Angostura Project is located on the Yaque del Norte River in the Dominican Republic near the City of Santiago. A 24 m high dam, a 3.6 km long power tunnel, a pit powerhouse with...
Tunnels and Vertical Shafts for Pumped-Storage
Economic considerations are of primary importance to the planning and designing of pumped-storage in an electrical generation and distribution system. This paper deals with the optimum...
Cofferdams: An Integral Part of Small Hydro Design
Cofferdam construction costs can be a major factor in the viability of a small hydro development. For this reason, cost-effective design and construction are critical. A cost-effective...
China's Ertan Hydroelectric Project
Ertan will be a major hydroelectric project on the Yalong River in China. The project consists of a 240 m high arch dam, two tunnel spillways, an overflow spillway, mid- and low-level...
Design of Isolated Small Hydro Stations
This paper presents some ideas concerning the criteria for the design of small hydro power stations operating isolated, and specially those to be installed in remote areas. Subjects covered...
Flashboard Alternatives Including Rubber Dams
This paper reviews some common flashboard methods used in the northeastern part of the U.S., and discusses the advantages and disadvantages of each type. The inflatable rubber dam is presented...
The Modification of Leroy Anderson Dam
An extensive modification program has been implemented to improve the safety and enhance the performance of the Leroy Anderson Dam. The Leroy Anderson Reservoir has a maximum storage of...
Hydraulic Model Studies - Sidney A. Murray Jr., Hydroelectric Plant
The power plant is located at the Old River Control of the Lower Mississippi River (Louisiana). It consists of an intake channel about 5000 ft long, a power plant with eight bulb units...
Physical Model Study of New York State Dam
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into six channels as the water passes...
Spillway Crest Development through Model Testing on Chenderoh Ambursen Dam
The Chenderoh Hydroelectric Project on the Perak River in Malaysia was placed in service in 1930. The hollow Ambursen dam was modified in 1944 by the additions of a concrete cap with flashboards....
Safety Evaluation of PG&E Dams
Pacific Gas and Electric Co. (PG&E) owns and operates 71 hydroelectric power projects in Northern and Central California. With 115 dams in its system, PG&E is the largest...
Ghost Dam Safety Evaluation
Ghost Development, owned and operated by TransAlta Utilities, is near the eastern margin of the Rocky Mountain Foothills, approximately 33 km northwest of Calgary, Alberta. The development...