Palaeohydraulic reconstruction of floods in upland UK bedrock streams: progress, problems and prospects
Palaeoflood evidence from five small upland Pennine catchments in the UK is used with the HEC-2 flow routine to simulate Holocene peak discharges. Even allowing for uncertainty, sensitivity...
Streamflow Related to Channel Geometry in Northern New England
Channel geometry measurements can be used to estimate various streamflow characteristics at ungaged stream locations. Channel cross section dimensions and sediment size distributions were...
Relation Between Largest Known Flood Discharge and Elevation in Montana
Previous studies relating unit discharge to elevation indicated that large floods in the Rocky Mountains may be limited by elevation. However, high-elevation data are sparse in Montana...
Historic-Flood Evaluation and Research Needs in Mountainous Areas
An evaluation of historic flood estimates in mountainous areas in Colorado was made to assess their accuracy. The purpose of this evaluation is to enhance awareness of the need to assess...
Determination of Sediment Profile for a Dry Flood Control Basin
A modification of the standard delta profile method was used to estimate the sediment profile in a dry flood control basin. Dry flood control basins do not have a normal operating pool...
Evaluation of Six Methods for the LP3 Distribution
Six frequently used estimation methods for the Log-Pearson type 3 distribution were evaluated using both the predictive and the descriptive performance indices. Ten LP3 populations and...
Discharge-Frequency Relationships in Distributary Flow Systems
The paper describes discharge-frequency relationships in distributary flow systems. The stream network that makes up the flow system is described in terms of how the various stream segments...
Comparison of Infiltration Equations Using Flooding Infiltrometer Data
Based on three flooding infiltrometer tests, 27 hydrographs produced by HEC-1 were used to compare peak discharge, time to peak, and storm runoff volume using three infiltration functions....
Problems of Stream Flood Simulation and Prediction
The article presents a report on the natural flooding in a stream and the problems encountered when simulating and predicting stream floods. The complexity of flood characteristics, the...
Hocking River Sedimentation Study
The channel improvement project located on the Hocking River in Athens, Ohio is estimated to have prevented over 68 million dollars in flood damages since its completion in 1971. However,...
Modelling of Flood Propagation Over Initially Dry Areas
This proceedings,
DSM Saves the Dam
The Miami Conservancy District built five flood control dams after the catastrophic flood of 1913 in Dayton, Ohio. Lockington Dam was one of these five hydraulic fill structures. The Ohio...
Scoping Out Scour
Bridge scour�soil erosion around piers and pilings�threatens tens of thousands of bridges across the U.S. Traditionally, engineers have mapped bridge scour by driving probes into the subbottom...
Prediction of Embankment Dam Breaching for Hazard Assessment
Downstream hazard assessments for dams require prediction of 1) whether a breach could form, and 2) the hydraulic characteristics of the breach for use in calculations of discharge and...
Construction of CCM Overtopping Protection on Three Parkway Dams
Cellular concrete mat (CCM) systems have been installed as overtopping protection on three small embankment dams along the Blue Ridge Parkway. Based on field tests by others and on the...
Economical Solution for Flood Overtopping Potential at Senator Wash Dam
A breach analysis of North Dike for overtopping with the crest modified to the lower elevation was required to ensure the breach discharge would be adequate to prevent overtopping of Senator...
Rehabilitation of Plane Nine Dam
Plane Nine Dam, an earthen water supply dam near Altoona, Pennsylvania, was constructed in 1907. The dam performed satisfactorily for more than 80 years but it deteriorated with time and...
Bureau of Reclamation Experience with Innovative Solutions to Increased Design Floods
Over the last several decades advances in the hydrologist's ability to estimate floods have resulted in increases to the design floods for many existing drainages. As with other dams throughout...
Use of Flood Control Features for Environmental Mitigation
The US Army Engineer District, Vicksburg (CELMK), plans to construct up to 167 water control structures, 52 confined disposal facilities, and 47 barrow pits as part of a major flood control...
Reliability Curves for Reservoir Performance
Seattle District, U.S. Army Corps of Engineers, has developed a family of reservoir guide curves that illustrate reliabilities when storage conditions gradually decline from 98% to as...