Integrated Monolayer Flexible Revetment Technology for Coastal Protection
Fundamental considerations for flexible revetment design are given in some detail and the critical need for sound engineering in a total system design approach is strongly emphasized....

Pass a Loutre Freshwater Diversions: Marsh Building in the Mississippi River Delta
Concern about the rapid loss of wetlands within the Pass a Loutre Wildlife Management Area located at the mouth of the Mississippi River has resulted in implementation of the Pass a Loutre...

Guadalupe Dunes Revegetation Program
The subject of this paper is a revegetation program currently being developed by McClelland Engineers and Cities Services for a five-mile pipeline construction corridor in the Guadalupe...

Environmental Compliance Inspections
No 'after construction' inspection has ever been conducted in the Corps to ascertain 'if' or 'how well' we...

Monitoring Completed Coastal Projects Results to Date
In 1981, the U. S. Army Corps of Engineers initiated a program of monitoring coastal projects. Called the Monitoring Completed Coastal Projects (MCCP) Program, its purpose is to aid in...

Monitoring of Water Quality During I-664 Dredging
Construction of Interstate Highway I-664 across Hampton Roads involves extensive underwater work and consequent risk of lowered water quality. This paper described field monitoring procedures...

Identification of Consciousness and Behavior of Japanese and the Living Environment in a Coastal Zone
Japan's policy of coastal zone management has changed from placing emphasis on seaside disaster prevention, industry location, and harbor construction to creating the amenities...

Major Offsite Mitigation: Batiquitos Lagoon
This paper discusses the general characteristics of the Batiquitos Lagoon Enhancement Project near Carlsbad, California, which will provide mitigation for a pipeline project in San Pedro...

Barrier Island Reconstruction in Louisiana
The Terrebonne Parish Government reconstructed thirty-eight (38) acres of Eastern Isle Dernieres, a barrier island off the coast of Louisiana, in an effort to retard coastal erosion (Figure...

The Impact of Suburbanization on an Urban River
A case study of the impacts of suburbanization on the water quality of an urban river was completed to detail the various impacts of suburbanization on the culture, economy and environment...

Restoring of Butcher's Slough Estuary?A Case History
A 30-acre parcel of former lumber and plywood mills occupying original estuary and salt marsh wetlands on the northern edge of Humboldt Bay, Humboldt County, north coastal California,...

Informal Regulatory Consultations: Greasing the Skids
Companies considering major coastal zone construction projects should conduct informal consultations with appropriate regulatory and resource management agencies early in the planning...

Coastal Area Development and Offshore Man-Made Islands
With offshore man-made islands, it is necessary to make the aims of land use clear in terms of the various conditions, such as a severe environment and vast construction costs. As technological...

Emergency Shore Protection
Emergency shore protection usually requires design and construction to be completed in a 2 to 3 week period. Emergency shore protection measures at Surfside and Ventura, California required...

Assessment of Beach Nourishment Methodoliogies
Although artificial beach nourishment has become a common practice for mitigating beach erosion in the U. S. , it lacks clear rationales for achieving optimum benefits. Four recent large-volume...

Earthen Liners for Land Disposal Facilities
Proper construction of compacted earthen liners requires special attention to construction details and quality assurance. Moisture content and weight of roller are probably the two most...

Impact of Current Regulations on Geotechnical Practice
Enactment of the Resource Conservation and Recovery Act (RCRA), which was intended to provide 'cradle to grave' management of hazardous waste, has caused a greater...

Slurry Trench Construction?Collier Road Landfill
The owner of an existing solid waste landfill has undertaken several measures to contain and recover near-surface groundwater at the site, including capping of the site with cohesive soil,...

Plastic Concrete Cutoff Walls
The studies revealed that plastic concrete can be prepared having a coefficient of hydraulic conductivity that is less than 1 multiplied by 10** minus **7 cm/sec. The shear strength of...

Influential Factors in Soil Liner Construction for Waste Disposal Facilities
Those factors most influential in the construction of a soil liner to meet a permeability performance standard of 1 multiplied by 10-7 centimeters per second (cm/sec) are identified and...

 

 

 

 

Return to search