Analysis of Missouri River System Operations Alternatives
The Corps of Engineers is conducting a study of alternative water control plans for the exiting Missouri River Mainstem System. Data on the effects of the alternatives on the various project...

Parallel SDP for Multi-Reservoir Management
The use of stochastic dynamic programming (SDP) for solving water resources problems has been restricted to problems with low dimension due to the 'curse of dimensionality'. Algorithm...

Water Resources Development in the 1990's: A New Process
The development of water resources to meet future water needs has become more complex nowadays as regulatory agencies attempt to balance the proposed consumptive uses of water with a wide...

Wet Detention Facility Pollutant Removal Modeling
This paper documents development of the WETPOND model, which simulates long-term pollutant removal by a wet detention facility. Pollutant removal is determined with an EPA procedure that...

Wastewater Reclamation at Davenport, Washington
The City of Davenport, Washington went through an extended process to update their undersized wastewater treatment and irrigation reclamation systems for municipal wastewater. The process...

Managing the Russian River Aggregate Resources
As a result of analyzing the Russian River and its capacity to provide gravel, and through a sound examination of the geomorphology, hydrology, and groundwater conditions, the Sonoma County...

Reducing Discharges from San Francisco to the Bay
The City and County of San Francisco (City) is fairly unique in the west because it has a combined sanitary and storm water system. When the current Wastewater Master Plan (WWMP) was completed...

An Integrated Approach to the Real-Time Control of Water Supply and Distribution Systems
In recent years, real-time automated operation and control schemes have been implemented for a number of water supply and distribution systems with varying degrees of success. This paper...

Reliability Analysis of a Multi-Reservoir Water Distribution System
A methodology for evaluating system reliability is developed to assist in the planning and management of a multi-reservoir water distribution system. The minimum cut-set approach is employed...

Public Involvement and Participation: Planning Imperatives for the Coming Century
The literature has identified three types of responses to natural resources planning and management efforts in the United States. The first focused upon the more effective use of existing...

Opportunities, Constraints and Change in Reservoir Management
Changing hydrologic, economic, social and environmental conditions have focused attention on the opportunities for changing reservoir management. Such change can occur in three areas....

Survey of Stormwater Detention State of Practice
A survey of stormwater professionals in the United States and Canada was conducted by the Urban Drainage and Flood Control District in 1991 regarding the current state of practice in the...

A Salmon Population Model for Evaluating Alternative Flow Regimes
Salmon populations in many Pacific coast rivers are in decline and in danger of becoming threatened or endangered. A fish population model that tracks chinook salmon from eggs to the immature...

Administering a Regulated Riparian System of Water Rights
Western states, facing steadily increasing demands on limited water resources, have developed administrative regimes for regulating water use based on the judicially developed private...

San Diego County Water Authority's Emergency Storage Project Supplying Water During Natural Disasters
The San Diego County Water Authority (Authority) is developing the Emergency Storage Project (ESP) to improve the dependability of the County's water supplies during a natural disaster...

The Job-Order Contracting Solution
A new method of contracting, Job Order Contracting, combines many contracts into one administered by one project team. They are competitively bid, indefinite delivery, indefinite quantity,...

CAD for Small Hydro Projects
The quest to reduce design costs and improve design quality by raising productivity is familiar to every manager and designer. This article examines how CAD can play a role by examining...

Rehabbing Bridges Under Traffic
Four urban examples demonstrate how an owner's decision to keep it open during rehabilitation construction forces the designers to contend with an extra set of problems. Reanchoring...

Locking Into Success
In 1961, at Wheeler Lock in Alabama, crews with the Tennessee Valley Authority tried to incorporate an existing lock wall into a new cofferdam. A major portion of the land wall slid about...

Coastal Groins and Nearshore Breakwaters
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers No. 6. This book provides guidance for the design and placement...

 

 

 

 

Return to search