Water Project Design and Safety: Prospects for Use of Risk Analysis in Public Sector Organizations
After offering some initial definitions, the authors will describe a highly structured model of risk analysis and water resources decision making in the public sector. The primary emphasis...

Factory Chic
Developers of the International Design Center of New York have recently spent $163 million to convert an unused chewing gum factory and a former battery plant into a showcase for New York...

Capitol Hill Infrastructure Advice
The National Public Works Improvement Council must report to President Reagan and the Congress by early 1987 on ways to maintain and improve the nation's infrastructure. One...

Rehabbing for Reuse
Case histories of four building rehabilitation projects highlight special challenges to their structural engineers. The Lits Building, Philadelphia, is a collection of eight structures...

A Study of Exterior Facades?Problems and Solutions
The quality of the exterior facades of a building is important to maintaining aesthetic image, protecting the interior environment from infiltration of heat, cold, moisture, wind, and...

The Basics of Water-Resistant Brick Walls
Water-resistant masonry walls of burned clay or shale brick are the result of a conscious effort to produce them, by everyone involved in their creation. Furthermore, owner maintenance...

The Metropolitan Boston Area Earthquake Loss Study
This study develops an inventory of critical facilities in the Metropolitan Boston area and analyzes the impact of a project earthquake (Cape Ann Event) on their structural integrity and...

Structural Design of the Defense Waste Processing Facility
The Defense Waste Processing Facility (DWPF) is designed to process radioactive defense waste sludge and the radioactive nuclides, cesium and stronium, from the salt solution. These radioactive...

A Generic Design for On-Site Low Level Radioactive Waste Storage
This paper describes a generic design for an on-site low level radioactive waste storage facility. The generic design encompases the development of design criteria including an envelope...

Building Arrangement and Site Layout Design Guides for On Site Low Level Radioactive Waste Storage Facilities
This paper will discuss a typical storage facility and address the design considerations and operational aspects that are generally overlooked when designing and siting a low level radioactive...

The Origin, Training, Evaluation and Status of Construction Inspectors
Inspection of construction is mandated by law. Design engineers cannot disclaim their responsibility for construction inspection by citing self-serving language in the contract documents....

Excellence in Inspection
Excellence in inspection starts with proper interpretation of specifications and drawings. There exists a void between the design team and the field people which must be bridged in order...

CM Certification and Registration
As currently practiced, the construction management system involves a team of the owner, design professional, and construction manager. The peer relationship to team members, nature of...

A Review of Current Contract Documents
Three separate industry groups have published contract documents to be used with the construction management project delivery system. The documents parallel each other in certain respects,...

Requirements of a High Technology Owner
The requirements of a high technology owner are best represented by a set of expectations and goals that are needed to achieve a certain business plan. There are extreme time pressures...

Structural Engineering for High Technology Clients
The unique requirements of the high tech industry provide interesting and fascinating challenges to the structural engineer of the 1980's. The following is a list of the most...

Design of High-Technology Facilities from the Vibration Standpoint
High-technology facilities, such as those used for the production of integrated circuits or for optics research, generally require extremely limited vibration environments. Suitable precautions...

Static and Dynamic Analysis of Highrise Buildings on Microcomputers
The author's experience in conducting static and dynamic analyses of three-dimensional multistory buildings on microcomputers using the tier building model and the method...

Graphics Based Preliminary Structural Design
During preliminary design, alternative structural configurations are explored and one or more alternatives are selected for further consideration. During analysis, a structural configuration...

Subdivider: Advanced Subdivision Design with the IBM-PC
SUBDIVIDER is an IBM-PC program which aids engineers in the process of dividing tracts of land into lots, streets, and building floor plans. It can be used for the design of traditional...

 

 

 

 