Lateral Load Resisting Systems for Circular Buildings
The design of structural systems to economically limit inter-story drift and building acceleration for circular high rise buildings is presented within the framework of two recently constructed...

Environmental Modeling of Coastal Wetlands
Several useful modeling techniques have been developed for the numerical solution of the vertically integrated Reynolds equations on unstructured grids in wetland environments. The objectives...

Modeling the Seasonal Circulation in Massachusetts Bay
An 18 month simulation of circulation was conducted in Massachusetts Bay, a roughly 35 m deep, 100?50 km embayment on the northeastern shelf of the United States. Using a variant of the...

Boston's Backup Water Supply
For fifty years, Boston's sole real source of water has been the Hultman Aqueduct, but now final design is almost complete on the MetroWest Supply Tunnel, a new, larger conduit...

Climate Change Impacts on Boston's Water Supply
The analysis of the climate sensitivity of the water supply system of the Boston area indicates that the water supply has the potential to be dramatically altered by global warming. The...

Stress-Deformation Behavior of an Embankment on Boston Blue Clay
An 11 m high I-95 embankment was thoroughly instrumented with piezometers, settlement rods and inclinometers to measure the behavior of the underlying 40 m thick deposit of Boston Blue...

Control of Odor and VOC Emissions at Wastewater Treatment Plants -Boston Harbor Case Study-
Siting of the new wastewater treatment plant (WWTP) for the Massachusetts Water Resources Authority (MWRA) in Boston was based on an assumption of mitigation of total reduced sulfur (TRS)...

Near Field Behavior of a Far Field Circulation Model
Output from the 3-D far field circulation model ECOMsi was compared with output from EPA initial mixing models in two simulations of coastal sewage outfalls - an idealization with steady...

Validation and Application of THE Model's Trip Table Estimation Process
The Highway Emulator (THE) Model is a microcomputer based travel demand forecasting program maintained by the Central Transportation Planning Staff (CTPS). In addition to the traditional...

Computer Applications on the Central Artery/Tunnel Project
Boston's Central Artery/Tunnel (CA/T) project consists of the reconstruction of a 4.2 mile segment of Interstate Route 93 in downtown Boston, a 3.3 mile extension of Interstate Route 90...

Multiparty Model Development Using Object-Oriented Programming
The Massachusetts Water Resources Authority (MWRA) has taken advantage of recent advances in object oriented programming to build a flexible input and output model of its water supply...

Citizen Participation in Water Supply System Planning and Management
The Water Supply Citizens Advisory Committee (WSCAC) is a unique citizens group. Although it is funded by the Massachusetts Water Resources Authority (MWRA), it has a paid staff who are...

Comparison of Aqueduct Reconstruction & Tunneling
The Massachusetts Water Resources Authority (MWRA) is proposing to provide redundancy for the Hultman Aqueduct which transports water over a distance of roughly 27 km. (16.9 mi.) into...

Sensitivity Analysis of Financial Forecasts for MBTA Infrastructure Investment Program
This paper describes a financial analysis methodology and model developed for the Massachusetts Bay Transportation Authority (MBTA), which provides comprehensive projections of the relationships...

Case Study of Electronic Toll Collection in the Central Artery/Tunnel Project?Boston
The purpose of this paper is to discuss the issues involved in incorporating new technology, specifically electronic toll collection into a large, long-term construction project. The paper...

The NS&T Intensive Bioeffects Surveys: Design Strategies and Preliminary Results
Intensive bioeffects surveys are conducted in selected areas where chemical data from the National Status and Trends (NS&T) Program indicate greatest potential for contaminant-related...

Federal Damage Assessments in New England After the Halloween '91 Northeaster
The unusually long period waves which characterized the storm of 30-31 October 1991 caused it to be one of the most destructive storms to impact the New England coastline. To assess emergency...

Revere Beach and Point of Pines, Massachusetts, Shore Front Study
This paper describes a study conducted by the Coastal Engineering Research Center (CERC) to determine the degree of storm protection provided by an existing coarse beach fill at Revere...

Boston Harbor Management: Issues, Structure, and Directions
Alarming reports of massive pollution, highly publicized legal challenges and even Presidential political campaign accusations, all helped earn Boston Harbor a world wide reputation during...

Advanced Highway Control on the Central Artery
The Boston Central Artery/Tunnel project involves highways 190 and 193, in downtown Boston, placing underground 7 miles of four to eight lane tunnels. The project, with 37 lane-miles underground,...

 

 

 

 

Return to search