Economic Analysis Guidelines?Western Area Power Admin
Guidelines addressing methods and procedures for evaluating benefit and cost components of power projects are being prepared for Western Area Power Administration to use in economic analyses...
Small Hydro Analysis and Reporting Program
The Ontario Ministry of Energy initiated a project to develop an analysis program based upon metric measures and Canadian costs. The Ministry of Energy of the Province of Ontario has been...
Spreadsheet Applications for Hydropower Developers and Operators
This paper will examine the role of spreadsheet analysis in all aspects of hydropower development. The structure of the presentation will be first to briefly present an overview of the...
New Directions in Financing Water and Power Projects
The financing of water and power projects is not business as usual. Two changes in recent times have resulted in major realignments in the way water and power projects are being financed....
Staged Water Resource Development Can Improve Economics and Advance Project Implementation
This paper provides reasons for staging, and describes functional types of staged developments, and planning and evaluation of these developments. Many water resources projects can be...
Bio-Economic Models for Measuring the Economic Effects of Hydropower on Anadromous Fish Populations in the Pacific Northwest
An empirical model is presented for predicting the net economic value of changes in recreational catch of salmon and steelhead in Oregon, Washington and Idaho associated with construction...
DURAPLOT: A Flexible Approach to Hydropower Site Optimization
The U. S. Army Corps of Engineers, North Pacific Division Office has over the past six years performed reconnaissance and feasibility level hydropower studies at a variety of sites throughout...
Small-Scale Hydro Power in Cold Climates
Small-scale hydro power is mostly developed under more pressing economical conditions than large hydro. It is therefore of great importance that the operation and maintenance costs are...
Status and Prospectives of Small Hydro Power Development in Egypt
The paper describes the current status of hydropower development in Egypt and its future prospects. Emphasis is made on reviewing the potentialities for small, mini and micro-hydropower...
Hydro Combine Option for Lakhwar Project
A new concept of providing a power house cavity inside the traditional gravity dam section has been explored. Preliminary investigations indicate that taking into account all the relevant...
Design of Siphon Penstocks for Low Head Hydros
Siphon penstocks have been designed and constructed at Jim Falls and Winter, Wisconsin at existing dams. Both hydropower projects are located on the Chippewa River. The design of these...
Turbine Intake Modification for Fish Passage
This paper describes one solution the U. S. Army Corps of Engineers has found to improve juvenile fish guidance at Bonneville Second Powerhouse on the Columbia River. Juvenile fish passage...
Design and Operation of a Differential Surge Tank
The differential type of surge tank is more effective in operation than the simple type because it reacts more quickly to load changes of all sizes. The differential tank is also usually...
Performance Evaluation of Rim-Drive Turbines
This paper will provide a performance evaluation of the technical and economic advantages and disadvantages of the rim-drive turbine after more than one year of operation. Technical aspects...
Generators with Shaft Mounted Turbine Runners
Water turbine runners mounted on an extended generator shaft are often specified to eliminate turbine bearings and the flexible shaft coupling. Two bearing single shaft turbine generator...
Pit-Type Bulb Turbines?An Economic Solution for Low-Head Applications
For improving the profitability of extremely low head power plants the pit-type bulb turbine conception was developed, based on extensive model tests and on the operating experience with...
Economic Evaluation of Replacement Turbine Runner Bids
Many owners of hydro facilities are investigating increasing plant capacity and output by upgrading existing hydraulic turbines. Typically, the owner will conduct a detailed feasibility...
Basic Considerations in Governed or Non-Governed Small Hydro Power Plants
This paper reviews the necessary studies and major considerations that must be completed for proper coordination and selection of a turbine governor, and generator. A discussion of the...
Programmable mMicroprocessors in Local Control of Hydro Power Plants
The main purpose of the control equipment is to provide the generator with means for operation of the power station equipment. There is a need for status information on the generating...
Voltage Versus Var/Power Factor Regulation on Hydro Generators
When paralleled to the utility bus, synchronous generators can be controlled using either terminal voltage or var/power factor regulation. Selection is dependent upon the size of the generator...
Return to search