Nuclear Power Plant Delays: Probable Causes and Resolutions
The nuclear power industry in the United States is experiencing technological as well as construction and operation problems in nuclear facilities. It is the intent of this paper to review...
Structural Retrofit for Nuclear Power Plants
Retrofitting of nuclear power plants is a major concern these days. Recent rulings of regulatory agencies have affected most of the generating plants in some way. The lessons learned from...
Nuclear Outages: An Approach to Project Controls
The nuclear refueling outage is short-lived, fast paced, and very costly to the nuclear utility. To better control modification expenses and reduce outage-related costs, utilities are...
Modifications At Operating Nuclear Power Plants
In these days of continuing regulatory requirement changes and high interest rates, the engineering of structural modifications for operating nuclear power plants has taken on greater...
Modifying Piping Systems During a Plant Outage
This paper describes methods to reduce problems in design and planning of modifications to piping systems during a nuclear plant outage. Significant differences between original design...
Intact Decommissioning Alternative for Nuclear Power Plants
Previous studies of decommissioning options for nuclear power plants have examined potential alternatives such as immediate dismantlement, entombment, and moth-balling. This paper describes...
A Model for Nuclear Waste Shipping and Storage
A management option for spent fuel assemblies from nuclear power plants is storage in away-from-reactor (AFR) storage facilities. The purpose of this paper is to preseent a new mathematical...
Oconee Spent Fuel Rerack
Spent fuel storage problems facing electric utilities with nuclear generation are growing more critical as existing spent fuel storage capacity is utilized. Due to the inaccessibility...
Coping with Transition: Improving the Management Process
At Arkansas Power & Light Company, the Energy Supply Department has some 2,000 employees and operates (in addition to providing General Office engineering, technical, and administrative...
Project Management for the Upper Harlem Electrification Project
The Upper Harlem Electrification Project consists of a 28 mile extension of 700 V. D. C. under-running third (current carrying contact) rail electrification from North White Plains, New...
Seismic Probabilistic Risk Assessment for Critical Facilities
Probabilistic Risk Assessment (PRA) for seismic events is currently being performed for nuclear power plants. The background on seismic PRA is presented along with a basic description...
Electric Utility Noise Emissions
Environmental regulations require that impact statements for new electric utility and industrial power plants include an evaluation of noise emissions. Variations in equipment sound power...
Environmental Noise Control for Industrial Facilities
The authors present a brief discussion of the criteria used to evaluate environmental noise control problems. Then, they discuss environmental noise control in the power, petroleum, gas...
Design and Operating Rules for Reservoir Storage to Offset Future Consumptive Use
The Washington Metropolitan Area (WMA) relies largely on the Potomac River for water supply. After many years of study, a coordinated regional operating plan was adopted by the water supply...
Software Authoring for the Rest of Us
Extensive use of high resolution graphics, form-oriented full screen data entry, and contextual help messages have proven to be an effective means of structuring the dialogue between the...
HEC5 Hydropower Simulation Enhancements
Acres version of HEC5 possesses enhancements in the logic governing conventional hydropower, pumped-storage, and system power simulation. This paper demonstrates the conventional hydropower...
Computerized Operation of California State Water Project
Hydraulic and electrical schedules for the California State Water Project are determined and dispatched from the Project Operation Control Center (POCC) in Sacramento. The dispatched schedules...
Optimization in Water Resources Planning
Recently developed optimization software represents significant first steps toward the application of the digital computer as a design and planning tool. This software has recently been...
Environmental Auditing?TVA's Experience
TVA has conducted 70 audits of various TVA operations including construction projects and power plants since 1981. In general, TVA's experience with environmental audits has...
Geothermal Salt Recovery From Evaporating Ponds
The water from geothermal reservoir 'Los Azufres' in Michoacan, Mexico, is characterized by its high content of chloride, silica, borum and arsenic. Due to the...