Equivalence Between Regular and Irregular Waves in Movable-Bed Models
Laboratory experiments were conducted to evaluate various irregular wave parameters to determine which provides the best match for the regular wave parameter used to develop design guidance....
The Equivalence of Path and Node Methods for Water Distribution Network Analysis
This paper deals with the equivalence between commonly employed methods, path and node adjustment methods, for analyzing water distribution networks. The basic equations for steady-state...
Coronarization of the Autonomous Water pump
The conventional hydraulic pressure multiplier has been successfully used by Belgian technician Robert Houman (1986) to provide a dependable source of water supply to the NATO-base at...
Performance Test of Some Selected Sediment Transport Formulas
Performance of some selected sediment transport formulas was tested using a parameter-sensitivity analysis and a series of numerical experiments with an imaginary channel data. Selection...
River Sediment Discharge Study?San Diego Region
Procedures and general results are presented of a recent study performed to estimate the average annual sediment delivery (sand sizes and larger) from sources discharging to the southern...
Physical Model Study of Navigation Conditions
This paper describes a physical model study performed to assess the impact of increased flows from a redeveloped hydroelectric generating station on the ability of pleasure boats to navigate...
Model Study to Design a Small Intake
A 1:4 scale model was used to design the make-up water intake structure for Burrillville Combined-Cycle Power Plant, Ocean State Power Project. The objective of the study was to assure...
The Study and Practice of the River Regime Planning and Sediment Management in Gezhouba Project of the Yangtze
Based on the Practice of Gezhouba Project, the first water control project on the mainstem of the Yangtze and the largest hydroproject in China, this paper lays emphasis on importance...
Cumulative Impacts Analysis on a Midwest Fluvial System
The US Army Corps of Engineers recently completed an analysis of the cumulative impacts of erosion control structures on the Platte River in Nebraska. This was done in response to concerns...
Mechanical Aspects of Intake Gates at John Hart Dam
As part of the John Hart Dam rehabilitation program completed in 1988, six new intake gates complete with guides and hydraulic operators were installed replacing the existing gates and...
Streamflow Forecasting: Experiences in Development of Customized Systems for Hydropower Operations
Technical advances in computers and real time data acquisition favor the development of computer based streamflow forecasting systems. These technical advances should be combined with...
Major Sedimentation Issues and Ongoing Investigations at the Federal Energy Regulatory Commission
There generally exist five types of sedimentation problems. These are watershed, stream, reservoir, estuary and coastal problems. At the Federal Energy Regulatory Commission's...
Momentum and Kinetic Energy Coefficient Research?Ramp Flumes
In October 1984. Reclamation Hydraulic Branch staff members investigated the operation of the A-Canal ramp at Klamath Falls, Oregon. The ramp flume was completed in 1983 as a water measurement...
Major Sedimentation (Erosion) Issues and Ongoing Research and Developments at the USDA-ARS
The U.S. Department of Agriculture, Agricultural Research Service (ARS) has research programs designed to produce techonology with which to predict, measure, and control erosion and sedimentation...
Intake Wheel Gates Sealing Arrangements
This article discusses the sealing arrangements for intake wheel gates. Advantages and disadvantages if upstream and downstream sealing arrangements including thier effects on the performance...
Ring Gate as Turbine Emergency Shut-Down Device
The ring gate, intially used as a regulating device in the early stage of the design of hydraulic turbines, has grown to a reliable emergency shut-down device. Incorporated in the hydraulic...
Measurement of Hydraulic and Environmental Effects of Aeration Devices in Douglas Reservoir
The releases from Douglas Reservoir experience periods of low dissolved oxygen (DO) content during the summer months. Tests were conducted during August 1989 to determine the effects of...
Modelling of Stages of Nile River as a Tool for a Better Water Resources Management
As far as Egypt is concerned, the Nile is not just a river, it is rather the pulsing nerve of life. Consequently, it was essential to maintain detailed information about its levels and...
Overview of Mathematical Models?River Nile/High Aswan Dam
This paper has been directed towards the presentation of seven reliable planning tools (mathematical models) that can be used for the investigation of the planning options facing policy...
The Piedra del Aguila Project Large Radial Gates
Piedra del Aguila Hydroelectric Project is on the Limay River in Argentina. It has a capacity of 1424 MW with annual energy of 5500 GWH. This is an overflow dam, with intake gates, penstocks...
Return to search