Space Station Freedom Attached Payloads and Commercialization
The Space Station Freedom (SSF) accommodates a class of payloads called external attached payloads. These payloads are attached to the main truss of Space Station Freedom through the use...
Technology Needs Development and Orbital Support Requirements for Manned Lunar and Mars Missions
This paper will present an overview of the critical technology needs and the Space Station Freedom (SSF) focused support requirements for the Office of Exploration's (OEXP)...
MALEO: Modular Assembly in Low Earth Orbit: An Alternate Strategy for Lunar Base Deployment
Modular Assembly in Low Earth Orbit (MALEO) is a new strategy for building an initial operational capability lunar habitation base. In this strategy, the lunar base components are brought...
Application of Automation and Robotics to Lunar Surface Human Exploration Operations
Major results of a study (RLSO, 89) applying automation and robotics to lunar surface base buildup and operations concepts are reported. The study developed a reference base scenario with...
Manifesting for a Lunar Robotic, Oxygen-Producing Base
Using robotic systems and human supervisory control, a lunar base reasonably be established to achieve full production within five years. Intermittent human presence works in coordination...
A Robotics Testbed for In-Space Assembly Tasks
The operations testbed of the Center for Space Construction at the University of Colorado is described. This testbed serves as a centralized testing environment for interdisciplinary research...
Prefabrication of Ceramic Segments by Compaction and Microwave Fusion Technology
Material source and environmental impacts are two major concerns in the application of conventional concrete technology in lunar base construction. In this study, the simulated lunar soil...
Space Construction: A CSI Perspective
This paper outlines the control structure interaction (CSI) problem for space construction engineers. An overview of the Control Astrophysics and Structures Experiment in Space (CASES)...
A Center for Extraterrestrial Engineering and Construction (CETEC)
The Center for Extraterrestrial Engineering and Construction (CETEC) has been envisioned as an organization, a center of knowledge and information, and a set of experimental test facilities....
Commercial Launch Facility Economic factors
Launch facility construction, maintenance and modification costs remain a largely invisible part of the cost of putting mass into orbit. The government can lease launch facilities to commercial...
Power for Magma Electrolysis
This paper summarizes qualitative issues of electrical power distribution for near-term lunar facilities. The issues to be discussed were developed during a conceptual study of a Lunar...
A Prototype Model for Human/Automation Trade-offs
Future space construction missions will involve both human and machine constructors. Selection of the optimum constructor mix requires a model of constructor capabilities and requirements....
Hedratecture and Artificial Gravity
There is a need, according to the National Commission On Space, to develop three critical space facilities: A Space Base, A Variable-Gravity Research Facility, and a Lunar Surface Outpost....
Application of Statistical Distribution Theory to Launch-on-Time for Space Construction Logistic Support
The Center for Space Construction (CSC) has acquired historical launch vehicle data for analyzing space launch vehicle logistic support of space construction. This analysis will include...
DYCAM: A Computer Aided Engineering Tool for Space Construction Planning
Planning and management of construction activities in space have not received sufficient attention up to the present. Space Station Freedom, a number of large platforms and extraterrestrial...
The Selection of Constructors for Space Construction
The process of space construction is defined by the construction goal and by the construction system selected to accomplish that goal. The goal provides the tasks that must be executed,...
A Language Model for Space Construction Control
The optimal construction system for many space construction projects is a mixed construction ensemble. Such an ensemble consists of humans, robots with varying degrees of teleoperation...
A Cost Study of Concrete Production on the Moon
In proposing and evaluating a construction system for a lunar base, the question of cost would be the most important one. Although it is not possible to conduct a detailed cost study at...
Creatively Cost Sharing a Large Flood Control Dam
The passage of Public Law 99-662 in November of 1986, commonly known as the Water Resources Development Act of 1986, added a new dimension to Federal development of water resource projects....
Balancing Needs: Growth & Infrastructure Rehabilitation
Long range planning must include more than construction of facilities to meet new demands for service. A conscious effort must be made to balance the need for additional facilities with...
Return to search