The Design of the Nanpil River Hydropower Project
In 1980, the State of Pohnpei (then spelled Ponape) asked the Pacific Ocean Division of the U. S. Army Corps of Engineers to investigate the feasibility of constructing a hydroelectric...

Racine?5 Years of Successful Operating Experience with the World's Largest Bulb Turbines
In September 1982 two bulb turbine generating sets with a runner diameter of 7700 mm and a generator rating of 25 MVA were put into commercial operation at the Racine dam on the Ohio river....

Synchronous Bypass Valves for Hydroplants
The requirement that synchronous bypass valves be provided on most hydroplants and the high cost of suitable valves have created a demand for rebuilt valves. Recently, the Bureau of Reclamation...

Upper Yellow River Projects and Longyangxia Station
The river stretch from Longyangxia to Qingtongxia, with a head drop of 1,465 m in a distance of 1,023 km (including backwater length of the Longyangxia Reservoir) is the focus of this...

Hydropower Development at North Hartland Lake, Vermont
The purpose of this paper is to give a short history of the first hydropower development by non-Federal interests at a Corps of Engineers flood control dam and reservoir within the jurisdiction...

Building Bridges Faster
Guidelines are presented that tell how to write a contract that will lead to radical reductions in the time to build or rebuild a bridge. The article covers how to write an incentive/disincentive...

Design and Construction of Lower Chase Creek Dam
Lower Chase Creek Dam is a roller compacted concrete flood control dam located in a generally dry creek in eastern Arizona. Dam design, including the site investigation and start-up of...

Construction of Elk Creek Dam
Construction of Elk Creek Dam, located in Southwest Oregon, is currently underway with completion scheduled for September 1988. The main dam contract was awarded to Ohbayashi Gumi Ltd....

Saco Dam?South America's First RCC Dam
Because of cost and a lack of suitable embankment materials, Saco Dam at Nova Olinda in Paraiba, Brazil, was redesigned and built with lean roller compacted concrete (RCC). The structure...

Burlington Cable-Stayed Bridge
The Burlington cable-stayed bridge will carry US34 over the Mississippi River from Burlington, Iowa to Gulfport, Illinois. There will be two 12-ft lanes in each direction plus an acceleration...

Quincy Bayview Bridge?Construction Control
A cable-stayed bridge crossing the Mississippi River at Quincy, Illinois, was completed in August 1987. The structure includes twin concrete towers and a hybrid deck section. The cable...

Application of Bayesian Methods to a Geotechnical Site Investigation in Mississippi
In 1981, the Army Corps of Engineers constructed an ammunition storage area at Bay St. Louis, Mississippi. This storage area is part of the Mississippi Army Ammunition Plant (MSAAP). Prior...

Modeling Hydrologic Components of the Upper St. Johns River Project
Off-line stormwater management areas and riverine marsh conservation areas are the major components of the Upper St. Johns River Project, Florida. Dimensions and operations of these components...

Stochastic Model for the Management of a Stream-Aquifer System
The management of a system of groundwater and surface water requires that the hydraulic connection of the two sources be investigated. The inherent uncertainties that exist in the data,...

The Remedial Action Plan for the Fox River, Wisconsin
The nature of and need for Remedial Action Plans (RAP) in 42 areas of the Great Lakes is reviewed with special attention given to the Fox River and Lower Green Bay area. A brief historical,...

Water Assurance Districts: A New Concept in Local Government
Society has long utilized local governmental units to implement numerous water management functions. This paper discusses a new and relatively unique local organizational structure now...

An Investigation into Causes of Bank Caving
A series of investigations into bank caving along the Ohio River are described. These investigations include a study of the distribution of precipitation in the study region, derivation...

Use of Stormwater Models to Optimize the Performance of a Regional Stormwater Detention System
implications of stormwater models to develop a regional detention basin master plan for Fairfax County, Virginia are described. Following the selection of candidate sites and detention...

Administration of Water in the 21st Century in Accordance with the Appropriation Doctrine
In accordance with the appropriation doctrine it appears straightforward to distribute water during below-average supply, 'first in time of use, first in right of use'....

Considerations in the Design and Installation of Horizontally Drilled Pipeline River Crossings
The authors will present a review of directionally controlled horizontal drilling techniques for pipeline installation by describing the state-of-the-art of the process vis-a-vis subsurface...

 

 

 

 

Return to search