Identification Techniques for Bank Erosion and Failure Processes
The Hydraulics Laboratory of the US Army Engineer Waterways Experiment Station (WES) has developed techniques to design small flood-control channels. A component of this research is the...
Stability Criteria for Revetments
A simplified 'black box' approach is presented for a number of revetment systems for banks and shore protection. The design criteria, based on the physical similarity...
The Influence of Uniformity on Riprap Stability
Studies have shown that size uniformity influences the stability of riprap. The ratio of fractional sizes of the riprap mixture, D60/D10,...
Riprap Stability Results from Large Test Channel
Velocity data from a large test channel were used to determine the distribution of depth-averaged velocity and shear stress on the side slope of both straight and curved channels. From...
Design and Construction of Soil-Cement Drop Structures
Soil-cement has been used as an effective and economical slope protection material for embankment dams and stream banks. This paper describes the use of soil-cement in the construction...
Scour in Non-Cohesive Beds at Culvert Outlets
An empirical relationship was developed to estimate the depth of scour in non-cohesive material at culvert outlets. The scour depth is expressed as a function of mean particle size of...
Maximum Scour Below Dams Caused by Over-Fall Flow
The scour of sediment below a check dam caused by over-fall flow will lead to the destruction of dams. The formation of the scour hole below the dam will lead to shorten the seepage lines,...
Bed Sediments and Bed Forms of the Lower Mississippi River
Approximately 500 bed material samples were collected from the thalweg of the Lower Mississippi River. At each sample location, a sonic record of the bed was obtained. From the appearance...
Characteristic Deformation of Alternate Bars Due to Low Flow
Experiments on the formation of a small meander-channel at low stage are conducted by supplying a proper discharge on initial bed of alternate bars that have been formed in experimental...
Sediment Concentration Measurements Below Small Headcuts
This study is designed to determine erosion rates downstream from a small headcut. The sediment concentration from a scour hole produced by a plunging jet is measured as a function of...
The Effect of Aeration on Scour
A vertical water jet was used to study the effects of entrained air, tailwater depth, size of bed material, jet diameter, and jet velocity on scour. Small amounts of entrained air were...
Development of a Computer Aided Decision Process for Channel Rehabilitation and Watershed Enhancement Techniques
To assist the engineer in planning and design of channel stabilization measures, an expert system (CADWET) was developed using a commercially available expert system shell program. The...
The Calculation of Flushing Flows for Gravel and Cobble Bed Rivers
Flushing flows are needed to remove fines and sand from a gravel or cobble bed river. A natural stream will have periodic high flows adequate for flushing of fines and sand, but the hydraulic...
River Sediment Discharge Study?San Diego Region
Procedures and general results are presented of a recent study performed to estimate the average annual sediment delivery (sand sizes and larger) from sources discharging to the southern...
Cumulative Impacts Analysis on a Midwest Fluvial System
The US Army Corps of Engineers recently completed an analysis of the cumulative impacts of erosion control structures on the Platte River in Nebraska. This was done in response to concerns...
Sediment Yield and Accumulation in the Cache River
Sediment data collected in the Cache River basin of southern Illinois were used to calculate the sediment yield from tributary streams draining into a significant wetland area. Sediment...
Effects of Low Drop Grade Control Structure on Bed and Bank Stability
The channel response upstream of a low drop grade control structure was documented using field investigations, analysis of the engineering properties of bank materials, and repeat cross...
Evaluation of Streambank Erosion Control Demonstration Projects
The Streambank Erosion Control Evaluation and Demonstration (SECED) Act of 1974 (Section 32 of Public Law 93-251) was enacted by Congress to obtain information on costs and performance...
Bank Erosion During the 1988-Flood in the Rumoi River
Observations of the bank erosion were performed in the Rumoi River after the flood in August, 1988. It was found from the detailed research that the pattern of the flood was an important...
Stabilization of an Alluvial Channel in an Urbanized Area
Grade stabilization structures have been used for many years to control degradation of alluvial stream in the southwest. These structures result in reducing the gradient of the stream...