Upriver Dam Hydroelectric Project Rehabilitation After Failure, Part A: Failure Investigation and Lessons to be Learned
A lightning strike caused electrical failure at Spokane's two Upriver power plants, resulting in the river overtopping Project embankments, and causing nearly 11. 5 million...

Upriver Dam Hydroelectric Project Rehabilitation After Failure, Part B: Rehabilitation and Enhancement of Project Civil and Mechanical Facilities
A feasibility investigation of rehabilitation alternatives was conducted which identified several alternatives for repairing the damage and placing both powerhouses back on-line. These...

Rehabilitation of TVA's Great Falls Project
After seventy-one years of productive service, this two-unit, 31,860 kV plant is undergoing a major rehabilitation. The deterioration of the project has been of concern since the beginning...

No. 1 Water Wheel Project, Gilman, Vermont
This paper describes the replacement of an old generating unit with a new unit in a turn-of-the-century mill building where three other such units were already operating. The key issues...

Echo Dam Small Hydrodevelopment
In the mid 1970's, Bountiful City Light and Power began investigating alternative energy sources to furnish power to their distribution system. They engaged the firm of Bingham...

Design Improvements on a Small Hydro Project
The Whiskeytown Hydroelectric Project, built for the City of Redding, California, provides an excellent example of the type of improvements in general arrangement which can be achieved...

Hydropower Development at North Hartland Lake, Vermont
The purpose of this paper is to give a short history of the first hydropower development by non-Federal interests at a Corps of Engineers flood control dam and reservoir within the jurisdiction...

Small Hydrodevelopment: An Owners Perspective?El Vado, New Mexico Hydroelectric Project
The construction of the El Vado Hydroelectric Project posed several unique problems. The joint ownership of the dam between a Federal and State agency was unique to the region. The proposal...

Our Municipal Water System Has Power
Hydroelectric potential exists in the Boulder, Colorado municipal water system. Excess pressure is developed in the water system because the water originates in the Rocky Mountains, west...

Hydropower Goes Downtown
Beneath a busy street in Southern California seems an unlikely location for a small hydroelectric generating plant. However, located just below El Segundo Boulevard in the town of El Segundo...

Pyrites Hydroelectric Project, Canton, New York
This paper describes the Pyrites Hydroelectric Project in Canton, New York, an 8-MW project completed in December 1985. The key to its successful development was a team approach that included...

Sinkhole Rectification by Compaction Grouting
The unraveling of the overburden by solution activity in karst formations has caused many problems in existing structures and has generated high foundation costs on new construction. Slurry...

Probabilistic Load Combinations in Nuclear Structures
A variety of loads affect a nuclear power facility during its lifetime. The magnitudes or intensities of these loads are uncertain, and for some of them, their time of occurrence is also...

Stochastic Properties of Wind Spectra
In the first part of this paper the correlation function of measured wind spectra is compared with theoretical correlation models assuming a stationary wind process. This comparison indicates...

Bayesian Updating of Seismic Fragilities of Nuclear Power Plant Components
Seismic fragility is represented by a curve of the conditiional probability of failure as a function of the peak ground acceleration. Since there are many uncertainties in the model and...

Revising a Reservoir Rule Curve for Multiple Uses
The Jackson Hydroelectric Project generates power, supplies municipal water, provides flood control, maintains anadromous fishery minimum instream flows and studies various reservoir rule...

Risk Management for Water Supplies During Droughts
This paper describes a method for deriving policies for the operation of public water supplies under impending and actual drought conditions. Unlike previous models based on optimization...

Alternating Direction Oxidation Ditches?A Cost Saving Technology from Denmark
A soon to be released EPA report claims that in Denmark, small alternating direction oxidation ditches (ADOD) save as much as 70% of the cost for conventional oxidation ditches. The alternating...

Reef Breakwater Response to Wave Attack
A method of predicting stability of a class of low-crested rubble mounds referred to as reef breakwaters is presented. Findings are based on a study which included an extensive series...

Water Power '87
The 1980's have been characterized as an era of uncertainty for world energy including future demand for energy, fuel prices and availability, regulatory constraints, environmental...

 

 

 

 

Return to search