Evaluating Financial Performance of Public and Private Firms Involved in Hydropower Development
The extended abstract compares companies that have gone public and the authors' own company which is private. Included are five publicly, or formerly publicly traded companies...

Capital Cost Modelling for Micro-Hydro Appraisal
Empirical capital cost models for mini- and micro-hydro installations have not been validated with consistent site information. This paper reviews cost modelling techniques and describes...

New Martinsville Hydroelectric Project
The New Martinsville Hydroelectric Project consists of a dual bulb unit, 34 MW powerhouse constructed at an existing lock and dam navigation facility. The project was completed on budget...

Jim Falls Hydro Redevelopment Project Construction
The Jim Falls Hydro Redevelopment Project consists of two 28.5 MW vertical Kaplan units in an enclosed powerhouse with an adjacent spillway. The spillway contains three radial gates, each...

Bonneville I Powerhouse Station Service Unit Rehabilitation
This paper presents the work being done towards the rehabilitation of the Bonneville I station service unit. The rehabilitation of this unit includes a generator rewind, excitation system...

The Construction of the Sidney A. Murray, Jr. Hydroelectric Power Plant
The project, consisting of eight 8.2m bulb turbines rated at 192MW, is located in the State of Louisiana and will use a portion of the water diverted from the Mississippi River to the...

Vertical Axis Hydro Turbines for Off Grid Installations
This paper describes the design, manufacture and testing of a 5 kW floating VAHT for use in tidal, ocean, and river installations. This work is based on the results of research contracts...

Characteristics of the Independent Turbine Testing Facility
The Independent Turbine Testing Facility (ITTF) located at the St. Anthony Falls Hydraulic Laboratory has recently undergone extensive upgrading, partially funded by a grant from the small...

Feasibility, Licensing and Design: Bradley Lake Hydroelectric Project
This paper describes the licensing, environmental, engineering, and design aspects of the project. Due to the project's remote location and geological setting, the paper will...

Retrofitting of Hydro Electric Generators with Bus Fed Solid State Excitation Systems
The Northern Hydro Division has completed retrofitting the excitation systems on 22 generating units ranging in output from 1 to 95 MWatts. The Big Creek Hydro Project upgraded these systems...

Trouble-Shooting Large Hydroturbine Bearings
Special problems associated with very large thrust and guide bearings and lubrication systems are presented, and cover common trouble spots, with examples. Various large hydroturbine bearing...

Hydroelectric Generator Rewinding Pitfalls and Means to Ensure Success
The failure or success of generator rewinding begins well before the actual rewind, and many of the pitfalls can be avoided if owners take some very important steps prior to the rewind...

Problems Associated with Large Hydro Generators
Since the early 1950s, hydro generators have increased in size from the 50 MVA range to much larger units employed today, many of which are in excess of 500 MVA. Such a tenfold increase...

Optimizing Joint Load Control for Hydroelectric Plants
This paper discusses a method to minimize water usage at a multi-turbine hydroelectric generating plant. At plants which do not spill water this optimization is directly converted to extra...

Electrical and Mechanical Design, Commissioning, and Performance of the Moose River Hydroelectric Project
The Moose River Hydroelectric Project is a single-unit run-of-river hydroelectric facility located near Lyonsdale, New York, and was developed by a private firm. The generating equipment...

Efficiency Monitoring Yields Large Revenue Gains
This paper presents a Washington Water Power Company program to increase hydroelectric plant operations' efficiency. This increase is due to improved flow, head, and megawatt...

Replacement of Computer Control at John Day Powerhouse
One of the first projects chosen by the Corps of Engineers for computer control was the John Day Project on the Columbia River. John Day powerhouse was completed in 1971 and has 16 generators...

Devil Canyon Powerplant Enlargement Project: Electrical Design Problems and Challenges
Devil Canyon Powerplant is a hydroelectric plant facility of the huge California Water Project. This powerplant is located 5 miles north of San Bernandino. It is currently being enlarged...

Distributed Control Applications for Utility Hydroelectric Plants
In 1984, Washington Water Power began a program to improve monitoring and control systems for hydroelectric plants. The control systems being improved with distributed control equipment...

Programmable Logic Controller Based Governor/Plant Controller
This paper discusses the performance characteristics of the programmable logic controllers (PLC's) is based governor, particularly speed resolution and response times. The...

 

 

 

 