Status and Prospectives of Small Hydro Power Development in Egypt
The paper describes the current status of hydropower development in Egypt and its future prospects. Emphasis is made on reviewing the potentialities for small, mini and micro-hydropower...

30 More Megawatts at the Don Pedro Project, Calif.
A unique and cost effective concept for installing an additional hydroelectric generating unit to an existing project in a very confined location is presented. The concept also allows...

Milltown Powerhouse Rehabilitation
The Milltown Powerhouse and dam are over 80 years old. The powerhouse and other structures were built in 1906 and are owned by the Montana Power Company. The plant is located on the Clark...

Modern Technology in an Ancient Environment?The Answan II Power Plant
The Aswan II power plant is located at the old Low Aswan Dam in Southern Egypt. This dam was constructed in the early years of the century in order to provide irrigation water for cash...

Managing the Jim Falls Hydro Redevelopment Project
This paper addresses two of the water management issues involved in the design and construction of the Jim Falls Hydro Redevelopment Project. These issues include selecting the optimum...

Rebuild of Ten Mile Intake Flume Structure for Electron Hydropower Project
In 1984 the Puget Sound Power and Light Company began a rebuild of what is popularly referred to as the 'world's crookedest railroad. ' The 'railroad'...

New Martinsville Hydroelectric Project
The 34MW New Martinsville Hydroelectric Project is presently under construction in West Virginia. Located at Hannibal Locks and Dam near river mile 126 downstream from Pittsburgh, PA,...

Large Capacity Rock Anchors Stabilize Bagnell Dam
Evaluations of spillway discharge capacity and stability of structures for the Osage Hydroelectric Project indicated that the Project was unsafe during the occurrence of the Probable Maximum...

Cedar Falls Project?Major Rehabilitation
This paper presents planning objectives and operational considerations which governed the design and construction of a major rehabilitation project implemented at the City of Seattle's...

Green Mountain Power Corporation Bolton Falls Hydroelectric Project
The project proceeded through preliminary design, FERC licensing, and into detailed design, following its selection as one of seven low-head redevelopment projects to be partially funded...

Murray Hydro Project?Structural Design
This paper will summarize design criteria, parameters, methods of analysis, and other relevant data that were used in the design process of the structural features of the Murray powerhouse...

Conceptual Design of Salt Caves Hydroelectric Project
The Salt Caves Hydroelectric Project, as proposed by the City of Klamath Falls, Oregon, is a prime example of a project where the design has been based on elimination and minimization...

Hydro Combine Option for Lakhwar Project
A new concept of providing a power house cavity inside the traditional gravity dam section has been explored. Preliminary investigations indicate that taking into account all the relevant...

Design of Siphon Penstocks for Low Head Hydros
Siphon penstocks have been designed and constructed at Jim Falls and Winter, Wisconsin at existing dams. Both hydropower projects are located on the Chippewa River. The design of these...

Turbine Intake Modification for Fish Passage
This paper describes one solution the U. S. Army Corps of Engineers has found to improve juvenile fish guidance at Bonneville Second Powerhouse on the Columbia River. Juvenile fish passage...

The Design of the Outlet for the New Koepchenwerk Pumpstorage Plant
The Koepchenwerk Pumpstorage Plant (1930) is going to be replaced by a new plant with a 150 MW Pumpturbine in a shaft. This paper explains the reasons for this replacement and gives a...

Single Conduit Dam Design
In today's arena of increasingly higher costs for major dams, planners and designers are continuing to look into ways of reducing the overall costs for the development of...

Civil Design of Underground Hydro Power Projects
Various reasons exist for the development of underground schemes. Limited space at dam sites in deep and narrow river valleys makes it favourable to separate the power house from the dam...

OK Menga Hydroelectric Project, Papua New Guinea
The Ok Menga project, currently under construction, consists of a run-of-river intake underground concrete and steel lined power conduit surface powerhouse with two 25 MW units and a 132...

Rock Engineering at Cat Arm Hydroelectric Development
Cat Arm Hydroelectric Development in Newfoundland, Canada, develops 129 MW from 384 m of head. The project was constructed between 1981 and 1984 and comprises 5 large dams, 5 small dams,...

 

 

 

 