30 More Megawatts at the Don Pedro Project, Calif.
by Christopher A. Gardner, Bechtel Civil Inc, San Francisco, CA, USA,Document Type: Proceeding Paper
Part of: Water Power '87
Abstract:
A unique and cost effective concept for installing an additional hydroelectric generating unit to an existing project in a very confined location is presented. The concept also allows for a construction access and a construction method which minimizes disruption to the operation of the existing plant.
Subject Headings: Construction methods | Power plants | Hydro power | Project management | Construction costs | Existing buildings | Benefit cost ratios
Services: Buy this book/Buy this article
Return to search