Future Transfers of Water and Conveyance Capacity Between the CVP and the California SWP
On November 24, 1986, the Bureau of Reclamation (USBR) and the California Department of Water Resources (DWR) executed an agreement known as the Coordinated Operations Agreement or COA....

Conjunctive Use of Surface and Groundwater Resources in the Central Valley of California
California Department of Water Resources (DWR) is evaluating the feasibility of incorporating a conjunctive use program into the State Water Project (SWP) to augment its delivery capability...

Shop Creek Stormwater Quality Enhancement Project
The advent of NPDES regulations for stormwater discharges creates a need to verify, on a regional basis, the effectiveness of emerging water-quality control technologies such as extended...

Modification to John H. Overton Lock and Dam
The Red River Waterway Project, Mississippi River to Shreveport, Louisiana, will consist of a navigation channel 9 feet (2.7m) deep by 200 feet (61.0m) wide, 5 locks and dams providing...

An Expert Advisor for Selective Withdrawal Operations
A rule-based computational advisor that aids in the selection of selective withdrawal operations for project release temperature maintenance is discussed. This advisor couples a one-dimensional...

Development of a Computer Aided Decision Process for Channel Rehabilitation and Watershed Enhancement Techniques
To assist the engineer in planning and design of channel stabilization measures, an expert system (CADWET) was developed using a commercially available expert system shell program. The...

Geomorphic and Sedimentologic Evaluation of a Proposed Flood Control Project, Truckee River, Reno, Nevada
Geomorphic observations, sediment data and shear stress analyses were integrated to evaluate the potential responses of the steep, coarse grained Truckee River to a proposed flood control...

Evaluation of Streambank Erosion Control Demonstration Projects
The Streambank Erosion Control Evaluation and Demonstration (SECED) Act of 1974 (Section 32 of Public Law 93-251) was enacted by Congress to obtain information on costs and performance...

Utilization of Stormwater Runoff to Recharge Underlying Aquifer
The expanding economy in Oman has led to rapid development in the Capital area. Water is critical to sustaining this rapid growth, and new sources of water are being sought to meet the...

The Piedra del Aguila Project Large Radial Gates
Piedra del Aguila Hydroelectric Project is on the Limay River in Argentina. It has a capacity of 1424 MW with annual energy of 5500 GWH. This is an overflow dam, with intake gates, penstocks...

Top Projects 1990
A dam, a bridge, an expressway, an interchange, flood control improvements, wastewater treatment and a dredged material containment embankment round out the 1990 Outstanding Civil Engineering...

Review of Garolim Tidal Power Project
The feasibility study of Garolim tidal power project made in 1981 was reviewed in 1986 and updated in 1988. The review study generally confirmed the result of the 1981 study. The generator...

Major Development and Transportation Projects
Public/Private Partnerships
This proceedings for Major Development and Transportation Projects contains papers and discussion summaries from the specialty conference Major Development and Transportation Projects:...

Let the Buyer Beware
As recently as the 1970s, state highway agencies blindly purchased land for projects without much concern for hazardous waste. But that changed in 1980 with Superfund legislation, specifically...

More Than a Public Hearing
Too often, required community input is reduced to the sometimes dreaded public hearing. Many formal public-involvement programs are comprised of no more than this minimal, yet essential,...

Yesterday's Swamp
Since the mid-80s there has been an explosion of engineering firms entering the wetlands design and restoration market. As yesterday's bogs and swamps, once drained and filled...

Untangling A Can of Worms
Increasing traffic volumes combined with rush-hour delays and commuter complaints have spurred New York State DOT to improve the capacity of a major interchange near Rochester. The interchange,...

Project Management: Now On-Line
Only 20 years ago, computerized project management was available only to large firms with mainframe computers. Even four or five years back, well into the personal-computer revolution,...

The Eichleay Formula�Time to Retire?
The Eichleay formula is the one most commonly used to settle claims by contractors against owners who delay a project. The formula is based on six questionable assumptions, however. When...

Facelift For an Interchange
The authors describe a $250 million reconstruction project on a three-level interchange linking I-84 and I-91 in Hartford, Conn., which is the largest rehabilitation project in the state's...

 

 

 

 