Golillas Dam?Design, Construction and Performance
Golillas Dam is a concrete face, gravel fill dam, 125 m (410 ft) high built seven years ago that has had some difficulties during its initial operating years; due to the shape of the canyon,...
Concrete Face Rockfill Dams of the Winneke Project
Two of the three dams forming the Winneke Reservoir, near Melbourne, Australia, are concrete face rockfill dams. A minor dam forming the sludge storage pond for the project's...
Foz do Areia Dam?Design, Construction, and Behaviour
The 525 ft (160 m) high Foz do Areia dam in the Iguacu River, Parana, Brazil, built by 'Companhia Paranaense de Energia - COPEL', between 1975-1980, is part of...
Construction of Foz do Areia Dam
The methods and equipment for the construction of Foz do Areia Dam during 1976-1980 in Brazil are described. Special emphasis is given to the rockfill construction. Foz do Areia was the...
Fortuna Concrete Face Rockfill Dam
The Fortuna Dam is a 60 m high concrete face rockfill dam located in Panama, designed to be built in two stages. This paper describes the construction of the first stage dam, 60 m high,...
Construction and Performance of Salvajina Dam
Salvajina Dam was constructed between July, 1982 and November, 1984. Relevant construction aspects are described, particularly those related with procedures and statistical data of the...
Design and Construction of Terror Lake Dam
Terror Lake Dam is a central feature of the 189 million Terror Lake Hydroelectric Project, located on Kodiak Island Alaska. The dam is a 193-feet (59 m) high concrete-faced zoned rockfill...
Construction of Concrete Face Rockfill Dams
The Hydro-Electric Commission, Tasmania, Australia has been building concrete face rockfill dams since 1968. Eight dams from 26m to 110m high have been completed, and the highest at 122m...
Upgrading to Super-Micros
The Association of Central Oklahoma Governments (ACOG) is a regional planning agency and Metropolitan Planning Organization in central Oklahoma, responsible for maintaining a large data...
POSIT?An Interactive Timing Optimization Program
A window-oriented, microcomputer-based signal optimization program called POSIT (Program for Optimizing Signalized Intersection Timing) has been developed that provides traffic engineers...
Control of Construction Equipment Processes
Transportation projects have long involved some of the most equipment-intensive field construction operations. They are already benefitting from automation in concrete batch plants, slip-form...
Highway Construction Inspection Management Using a Microcomputer
This paper describes the operation of the Highway Construction Inspection Management Program (HCIMP). HCIMP is a microcomputer based data base management program which enables engineers...
Microcomputers in Construction Management
The availability of low cost microcomputers provides the construction engineer an opportunity to exploit the use of computer technology. This paper discusses the answers to six questions...
Applications of Microcomputers for Bridge Design
This paper examines the role of microcomputers in the design divisions of state departments of transportation, specifically in bridge design applications. Consideration is given primarily...
Basic Freeway Section Design and Analysis
This paper presents the development and applications of an interactive, microcomputer-based program, FREWAY, for the design and performance evaluation of a basic freeway section with consideration...
Designing Infrastructure User Charge Strategies
The changing environment of public finance is such that greater use of self-funding and financial independence will be required of public facilities and municipal services. Traditionally,...
Infrastructure Rehabilitation: New Technologies
The paper discusses developments in a number of areas that may be brought to bear on the problems of infrastructure deterioration and rehabilitation. Among the subjects discussed weekly...
Funding Streets as a Public Utility
A group of public works professionals in Washington State met in 1982 to explore using the public utility approach to street and transportation system funding. Since that time several...
Population Growth in California
The State of California will continue to grow at the same rate and number of inhabitants from 1980 to 2000 that it did in the previous twenty years from 1960 to 1980. It will slow down...
Recent Developments, Future Needs and Opportunities in Pavement Technology and Management
The Strategic Highway Research Program (SHRP) represents a massive research effort aimed at developing implementable solutions to five well-defined pavement problem areas. Pavement management...
Return to search