An Object Oriented Design Methodology for Systems Integration ? A Research-in-Progress Report
This paper reports the progress of a research project to develop an object oriented design methodology for systems integration. The paper discusses motivation for this research, research...
Construction Process Knowledge Model to Assist Method Selection?Research in Progress
The project planning stage is a very critical stage in the construction project development and delivery phase of the lifecycle of a building project. This stage creates the framework...
Integrated Design and Construction Planning by Knowledge-based Systems
The main objective of this paper is to describe applications of knowledge-based systems for the improvement of planning and management efficiency at the early design stage, and to propose...
Factors Affecting the Transfer of Expert Systems Technology
Increased complexity of facilities, owners' changing needs, inadequate construction methods, and international competition have created strong demands for advanced construction...
Learning and Innovating in a Construction Technology Laboratory
It has been generally recognized that the construction industry world wide, and especially in the U.S., needs innovative changes in order to produce more complex products at higher quality...
Case Method to Educate Innovation Champions in Construction
This paper describes a recent experimental course concerning management of technology for construction innovation. The experience of conducting this course indicates that the case method...
Geotechnical and Construction Aspects of the Immersed Tube Tunnel in Boston Harbor
An immersed tube tunnel (ITT) approximately 3,850 feet in length will be constructed as a part of the Central Artery/Tunnel Interstate Highway Project located in Boston, Massachusetts....
Immersed Tube Tunnel, Boston, Massachusetts
A four-lane Immersed Tube Tunnel is planned for the crossing of Boston Harbor from the City of Boston to the Logan Airport area in East Boston. The immersed tube consists of 12 sections...
Boston Central Artery/Tunnel Project?Fort Point Channel I-90 Tunnel Crossing
Part of the Central Artery and Third Harbor Tunnel Project involves the construction of a very unusual section of immersed tunnel. While the Third Harbor Tunnel which will cross Boston...
The Impact of User Interfaces on CAD Systems
The generation of architectural layouts through knowledge-based techniques forms a notable focus in design research efforts. A significant aspect of this research centers upon the development...
An Object-Oriented Simulation System for Construction Process Planning
This paper presents an object-oriented simulation system designed to integrate specific construction knowledge into construction process planning. Using the object-oriented representation,...
Construction Technology/Method Identification and Selection System
The proliferation of construction technology and the characteristics of technology information, such as complexity, interdependency, etc., pose the need for a well-organized technology...
Resource-Driven Scheduling
As the project management techniques get applied to more and more human resource intensive projects, the topic of more effective resource planning has become one of the major issues in...
Construction Quality Management
The Resident Management System (RMS) is a microcomputer based quality management and contract administration system designed specifically for resident engineers, by the Los Angeles District,...
Dispute Resolution: An Alternative to Litigation
A dispute, usually involving several parties, several million dollars and spanning many years, is settled on the court house steps. Excessive costs of litigation and arbitration has caused...
Dispute Review Boards ? Not Just Another Alternate Dispute Resolution Method
Dispute Review Boards are developing an impressive track record as practical and effective mechanisms for avoiding and resolving contractual disputes. Preliminary research findings indicate...
Hydrodynamics and Mass Transfer on a Moving Drop of Water
The fluid dynamics and mass transfer associated with moving water drops are examined. In the first part, numerical solution of the transient hydrodynamics around and inside a drop falling...
A Gas Chromatographic Protocol for the Measurement of Krypton Gas in Water
This paper presents the results of a study to investigate the feasibility of using a gas chromatographic (GC) technique for the measurement of non-radioactive krypton gas concentrations...
Steady Turbulent Gas Desorption in Surface Condenser Tubes
A one-dimensional steady two-phase separated flow model in conjunction with the energy and mass transfer equations and an associated turbulent mass transfer coefficient model are utilized...
Where Does Rock Begin for Three Highway Projects?
'Where does rock begin?' was a question raised on three large highway projects in the western United States. The question was successfully answered by a variety...
Return to search