Diffraction of Waves by Semi-Infinite Breakwater
Hovering Breakwater
Floating Breakwater for Reservoir Marinas
Wind-Generated Wave Diffraction by Breakwater Gap
People: Moles Elect Alger President
People: Brand Elected President of Moles
People: Budd and Buckley Receive Moles Awards
People: Baker and Cruz Honored by Moles
People: Stinson Honored by Moles for Achievements in Construction
People: Kolaya Elected Moles President
Breakwaters '99
First International Symposium on Monitoring of Breakwaters
The papers present state-of-art methods and technologies that are used in the structural and environmental monitoring of rubble mound breakwaters. Structural monitoring concerns the structural...
Physical Model of Current-Induced Scour at Ventura Harbor
This paper describes a 1:25-scale movable-bed physical model study of scour resulting from longshore current passing through a narrow gap on the leeside of the detached breakwater at Ventura...
Berm Breakwaters?Design, Construction and Monitoring
The philosophy of the fieldwork of Berm breakwaters was applied in Iceland. A few case histories were described with emphasis on quarry investigations, design, construction and monitoring....
Comparison of Hydrodynamic Parameters for a Floating Breakwater
The U. S. Army Engineer Research and Development Center is in the process of developing a Rapidly Installed Breakwater System (RIBS) for use in Joint Logistics Over the Shore Operations...
In Situ Behavior of Breakwaters in Constantza Port?Romania
In order to build breakwaters, especially in the areas with heavy storms, a special analysis on the several factors is necessary. In addition, surveillance of time behavior of breakwaters...
Montioring and Modeling of Tandem Breakwater System at Hammond, IN
A tandem breakwater system was constructed in 1989-90 to provide protection for a large marina at Hammond, IN, at the south end of Lake Michigan. A five year monitoring program (1993-98),...
Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...
Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...
St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...
Applications of Multibeam Echo Sounding with Topographic Mapping for Monitoring of Rubble Mound Breakwaters
Analysis of data from the breakwater monitoring program indicates the integration of multibeam survey capability with the increased accuracy of OTF DGPS positioning and advanced data management...
Return to search