Certification Challenges in the Development of an Innovative High Payload Capacity Spent Fuel Transportation Cask
The design approach and certification strategy used in the development of an innovative transportation cask for legal weight truck shipments of spent nuclear fuel is presented. The proposed...

Geochemical Modeling: An Integrated Approach to Nuclear Waste Disposal Issues
To meet nuclear waste repository licensing requirements, the response of repository components and of the enclosing host rocks and fluids to temperature fluctuations, fluid flow, radionuclide...

Systems Engineering Applied to a Regulatory Program
The Nuclear Waste Policy Act directs the Nuclear Regulatory Commission to complete the licensing hearing process for the High-Level Radioactive Waste Geologic Repository within three years,...

Preparing a Safety Analysis Report Using the Building Block Approach
The credibility of the applicant in a licensing proceeding is severely impacted by the quality of the license application, particularly the Safety Analysis Report. An incomplete, unintelligible,...

Overview of the U.S. Department of Energy's Pace-90 Geologic Repository Performance Assessment Exercise Activity
During 1989, the U.S. Department of Energy (DOE) initiated a determined effort to integrate and focus the performance-assessment activities required to support the preparation of an Environmental...

Natural System Issues in the OCRWM Program
Twenty four site characterization Issues, most of which pertain to the natural system, are presently defined in the Office of Civilian Radioactive Waste Management (OCRWM) Program for...

The Fine Print
An engineer who uses software, or supervises those who do, must know the laws regulating its purchase and use. Whether a company contracts for custom software, or leases, licenses or contracts...

Relicensing: The New Rules of the Game
The Electric Consumer Protection Act of 1986 is an elaborate array of procedures and decisional standards that guide the Commission's consideration of both initial license and Federal...

Compliance Administration in the Office of Hydropower Licensing
Since the passage of the Electric Consumers Protection Act (ECPA) on October 16, 1986, the Commission has effected a number of organizational, programmatic and regulatory changes consistent...

Licensing the Moose River Hydroelectric Project
This paper describes environmental considerations in the licensing and permitting of the Moose River Hydroelectric Project, a 12.2 MW development in Central New York State. It illustrates...

The Renovation of the Mechanicville Hydroelectric Station
The Mechanicville Hydroelectric Facility, owned and operated by Niagara Mohawk Power Corporation, was first developed in 1897. This paper traces its history, relicensing and new design....

Effects of the Environmental Approval Process on Project Scheduling and Economics
The environmental approval process is fundamental to the permitting of hydropower projects. Recent changes in permitting requirements has had a significant effect on the cost and schedule...

Licensing in the 1990's: Can FERC Be a One-Stop Shop?
The Federal Water Power Act of 1920 was enacted in order to create a comprehensive licensing scheme for hydroelectric power development. Central to that scheme was the consolidation of...

The Direction of FERC's Envorcement Program
This article discusses recent developments in enforcement by the Federal Energy Regulatory Commission ('Commission' or 'FERC') of its...

Optimum Use of the Water Resource a Factor in the Hydroelectric Relicense Process
To meet Federal Energy Regulatory Commission (FERC) requirements for a new license, owners must demonstrate full development of the available water resource. This paper presents an approach...

Overview of EPRI's Hydro Program
The near term objective of the Electric Power Research Institutes (EPRI) Hydro Program is to provide practical and easily used research results and industry guides in the areas of dam...

EPRI's Hydro Relicensing Strategy
The most successful relicensing program is anticipated to involve an aggressive, proactive strategy as follows: select a small, responsive management team to make the decisions concerning...

Water Quality Studies for Hydro Licenses
Three case studies on the impact of hydro operation on dissolved oxygen concentration performed for hydro license applications are utilized in a discussion of water quality issues. A negative...

Instream Flow and Energy Production Studies for Hydro Relicensing
A methodology for assessing the effects of alternative flow release scenarios on both aquatic habitat and on energy production was utilized during instream flow studies at a 72-MW hydroelectric...

Feasibility, Licensing and Design: Bradley Lake Hydroelectric Project
This paper describes the licensing, environmental, engineering, and design aspects of the project. Due to the project's remote location and geological setting, the paper will...

 

 

 

 