Coping with Transition: Improving the Management Process
At Arkansas Power & Light Company, the Energy Supply Department has some 2,000 employees and operates (in addition to providing General Office engineering, technical, and administrative...

Project Management for the Upper Harlem Electrification Project
The Upper Harlem Electrification Project consists of a 28 mile extension of 700 V. D. C. under-running third (current carrying contact) rail electrification from North White Plains, New...

Operations Improvement through Product Evaluation
Transit Managers today are involved in a battle to maintain the quality of their systems. This paper takes a close look at several problems and then suggests a cure that can be effective...

Acoustic Emission Monitoring of Grout Movement
This paper describes the acoustic emission (AE) method in general, and in particular the AE system which holds significant promise in this regard. Used was a multichannel AE system which...

Cost Assessment of Construction Noise Control
The results of a series of studies have provided noise control engineers with a method to estimate off-site construction noise levels and the cost of reducing these to acceptable levels....

Electric Utility Noise Emissions
Environmental regulations require that impact statements for new electric utility and industrial power plants include an evaluation of noise emissions. Variations in equipment sound power...

Cost-Effective Design of Practically Vibration-Free High-Technology Facilities
Advanced electro-optical equipment, such as that used in the production of integrated circuits, requires clean environments with extremely limited vibrations. Ground motions, personnel...

Site Selection and Building Design for Minimizing Vibration
Over the last five to ten years, line resolutions required for state-of-the-art semi-conductor wafers have dropped to well below 1 micron. As a result, controlling environmental building...

Lift Bridge looks Like Sculpture
A lift bridge built in 1926 over the U.S. Canal at Kaukauna, Wis. was replaced by a sleek new lift bridge whose sculptured shape encloses all the machinery within welded steel box sections....

Optimizing Computer Aided Planning
Computer aided planning may fail if new or untried computer programs or new equipment is used when time is limited. Eleven leadership skills helped the Utah Projects Office, US Bureau...

Electrically Fired Incinerator System for Combustible Radioactive Waste
DuPont Company and Shirco, Inc. are developing a process to incinerate plutonium-contaminated combustible waste in an electrically fired incineration system. Preliminary development was...

Problems in Design of Small Reverse Osmosis Water Purification Systems
Small reverse osmosis water purification systems may be defined as those systems which produce from 100 to 20,000 gallons of water per day. This paper identifies some of the common problem...

Transition in the Nuclear Industry
Significant changes have occurred within the utility industry within the past 10 years. Projected growth in electric power demand has not materialized. Nuclear power plants, with long...

Noise and Vibration Measurement
Prediction and Mitigation
The papers included in this publication represent a comprehensive view of three major sources of noise and vibration in our environment: Construction equipment and operations; transportation...

Bath County Pumped Storage
The Bath County Hydroelectric Pumped Storage Project provides 2,100 Mw of peak power to Virginia Electric & Power Co. and Allegheny Power Co. Called a bargain at $1.6 billion,...

Construction-Induced Dynamic Pressure and Corresponding Impact Factors for Pipelines
The Bureau of Reclamation, U. S. Department of the Interior, conducted a study which measured pressure exerted by construction scrapers on a rigid, buried, instrumented concrete slab....

Overview of EPRI'S Solid Waste Environmental Studies
The Electric Power Research Institute (EPRI) initiated a comprehensive research project in 1983 with the long-term goal of improving and validating methods for predicting the fate of chemicals...

Microcomputer Control for a Small Hydroelectric Peaking Plant
Peaking plants pose a special problem for control. The new facilities are generally a very small part of a large system. Determination of the parameters necessary to run the plant to best...

Economics of Hydrothermal Power Development
The overall performance of a hydrothermal power plant with pumped storage is more cost effective than its competitive counterparts such as oil and gas turbine-generators. The operation...

Seasonal Hydrothermal Operating Plans
An interactive computer model is presented which provides graphical displays of alternative generation patterns for an integrated hydroelectric and thermal system. The method for analyzing...

 

 

 

 

Return to search