Thaw Settlement as a Result of Permafrost Deterioration
An overview is given of floor and footing failure as a result of deterioration of permafrost. Consideration of causes for the deterioration and methods of repair are addressed in general...
Creep Rate Analysis of Pile Load Test Data
The uniform creep behavior of five driven piles and one slurried pile based on pile load test data are presented and analyzed. The incremental static load tests carried out by ARCO, Alaska...
A Beaufort Sea Deepwater Production Structure
There will be a need for large crude oil production platforms in Beaufort Sea water depths between 20 and 50 m and at locations with soft seabed soils and far from readily exploitable...
A Hybrid Structural Ice Defense Mechanism
A hybrid plate composed of steel outer surfaces and a concrete core has characteristics that make it desirable for use on offshore structures in ice prone environments. The service and...
Cost-Effective Arctic Concrete Structures
The economic development of offshore Arctic petroleum fields dictates that Arctic structures be both cost-effective and deliverable with minimum lead time. Concrete structures are typically...
Multi-Truss Design for Tower
A modified structural steel system of outrigger trusses and belt trusses bolster the 54-story Equitable Tower West. Located in New York City, the building's structural system...
Maintaining a Natural Gas Pipeline in Active Landslides
This paper deals with a pipeline section on both sides of Douglas Pass in west Colorado. Landslide activity in the area has been causing considerable problems and disruptions of the pipe...
Quality Control Management of Real-Time Data
Recent improvements in the real-time acquisition of hydro-meteorological data have raised concerns regarding the quality of the data received. This paper presents several data verification...
Methods for Reliability Analysis of Water Distribution Networks
A detailed review of the literature reveals that there is currently no universally accepted definition or measure of reliability for water distribution networks. The purpose of this paper...
Initial Operation Model for the Central Arizona Project
A microcomputer program for operating uncompleted portions of the Central Arizona Project has been developed. Engineers may use this program daily to assist in scheduling pumping plant...
Nuclear Outages: An Approach to Project Controls
The nuclear refueling outage is short-lived, fast paced, and very costly to the nuclear utility. To better control modification expenses and reduce outage-related costs, utilities are...
Intact Decommissioning Alternative for Nuclear Power Plants
Previous studies of decommissioning options for nuclear power plants have examined potential alternatives such as immediate dismantlement, entombment, and moth-balling. This paper describes...
Local Pressure in Ice-Structure Interactions
Two models for the determination of local pressures during marine ice or iceberg collisions with bottom-founded structures are presented. The first model is a two-dimensional analytical...
Managing a New Start Rail Transit Agency
In 1982 the Southern California Rapid Transit District (RTD) was facing two major challenges. A Policy and Management Plan was developed to meet these two major challenges. The Policy...
Managing Major Transit Construction Projects
Building rapid transit systems is a regular and ongoing world wide occurrence. However, for cities initiating first time transit system development it is truly a unique experience. Initiating...
Organization for Rapid Transit Design and Construction
This paper discusses organizational arrangements for design and construction of rapid rail transit systems and the advantages and disadvantages of the various organizational arrangements....
Organization for Construction of a Rail Transit Project
The Long Beach-Los Angeles rail transit project is part of an on-going transit development process by the Los Angeles County Transportation Commission (LACTC) in which the Long Beach-Los...
Cultivating Community Confidence?The Key to Success or Failure
A successful community participation program proved to be the turning point for federal approval of the Buffalo, New York rapid transit project. This paper details that citizen involvement....
MBTA Red Line Extension Operating Plan
Completion of the MBTA's 3. 2 mile Red Line Rapid Transit Extension is scheduled for 1985. When completed, the seven year 574 million project will add three new stations to...
Classification of Human Errors
Error control should be a primary part of any risk control strategy. Classification of errors may serve as a basis for the systematic analysis to eliminate the causes and to reduce the...
Return to search