An Analysis of Traffic Signal Safety Improvements
Identifying high accident rate locations and determining that they have an overrepresented type or pattern of accidents is an important first step in the safety improvement process. However,...

Location and Development of Safety Projects
Projects to be considered for inclusion in the Highway Safety Improvement Program (HSIP) must be part of a prioritized listing in which each project is based on accident experience or...

Evaluation?A Key to Safer Design Standards
Public highways are designed and constructed in accordance with established standards which have been developed over the years as a result of research studies or developed by committees...

A Salt Solution for Nuclear Wastes
The Department of Energy's Waste Isolation Pilot Plant in Southeastern New Mexico is the nation's first full-scale facility for disposing of radioactive waste...

Back on a Full Speed Track
A $30 million rehabilitation project is transforming a Massachusetts rail line that shows its age and poor maintenance history. Rehabilitating the line from Bristol County, Mass. to Hyannis...

Fire on the Water
Incineration is a promising hazardous waste disposal technique. However, nobody wants an incinerator constructed near him, so waste handlers are considering burning hazardous wastes at...

Attapulgite: A Clay Liner Solution?
Poor performance of clay liners at waste management facilities has resulted in the EPA mandate of synthetic polymeric liner materials to comply with zero penetration requirements. Laboratory...

Risk Assessment: Engineering Tool
In factoring in human-health impacts when tackling an environmental problem, risk assessment is often the best approach. Its use is growing fast. The technique increasingly is being used...

Explosion Hazards to Urban Structures
Manufacture, storage and transportation of chemicals capable of exploding at energy levels comparable to TNT has increased in recent years. Land areas adjoining such facilities and transportation...

Regional Risk Assessment of Existing Buildings
This paper describes current research underway at Stanford University designed to develop a methodology for determining high risk buildings in a region. The work involves developing a...

Ambient Vibration Testing of the Foothill Communities Law and Justice Building (abstract)
This paper presents the results of two ambient vibration tests conducted on the Foothill Communities Law and Justice Center Building. One ambient test was performed in 1985. The second...

A Recommended Federal Action Plan for Reducing Earthquake Hazards of Existing Buildings
In September 1985 a Five-Year Plan for reducing earthquake hazards of existing buildings was submitted to the Federal Emergency Management Agency. This plan, prepared by the Applied Technology...

Reshaping Providence
By moving railroad tracks, river banks and several roadways, Providence, Rhode Island is reclaiming some 45 acres in its downtown and capital districts. This public works package is the...

Disney Engineers Voyage to the Deep
The main show at the Living Seas Pavilion, part of Walt Disney Production's EPCOT Center, Lake Buena Vista, Fla., is a visit to a tropical coral reef deep under the ocean....

Alternative Dispute Resolution
Usually it takes far less money and time to resolve a construction dispute if a lawsuit and court trial can be avoided. In the mini-trial, te two or more parties agree to radically reduce...

Ports in Transition in the Developing World
Export led strategies have been proposed by the main financial institution as a way for these countries to emerge from the downturn. This policy relies heavily on foreign trade. Transportation,...

Construction Approaches to the Navy's Floating Pier Concept
The subject of this paper is a floating pier which is currently under evaluation as a more cost-effective solution for berthing Navy ships. This new approach to pier design was sponsored...

Master Plan for Rehabilitation, Modernization and Expansion of the Port of Suez
Rehabilitation and expansion of the Port of Suez, started in 1977, has been an ongoing process for the last eight years and is continuing. As a result of detailed planning of facility...

Financial Analysis of Port Facilities
This paper describes a spreadsheet-based structure for financial analysis of port facilities and services, designed for use as a planning tool by non-specialist port managers. The paper...

Port Master Plans and Feasibility Studies
Port projects are cost-intensive long-life irreversible assets, and developing countries particularly limping with resource constraints could not afford the luxury of short-sighted defective...

 

 

 

 

Return to search