The Effect of Geology on the Dinkey Creek Project
The proposed Dinkey Creek Project is located about 40 miles northeast of Fresno, California. The project consists of a 360-foot high rockfill dam, two powerhouses, 41,600 feet of power...

Sidney A Murray Jr. Hydroelectric Project
The Sidney A Murray Jr. Hydroelectric Project is being designed and constructed by EBASCO Services Inc. for the City of Vidalia (La) - Catalyst, Old River Hydroelectric Ltd Partnership....

Lake Tap?Crater Lake
The Crater Lake Phase of the Snettisham Hydroelectric Project has been designed and is currently under construction. This paper describes the design and construction of the lake tap which...

Geotechnical Exploration?Rio Bravo Hydro Project
In order for the Rio Bravo Hydroelectric Project to become a reality, a thorough evaluation of alternative project configurations was necessary. Various power canal shapes, sizes, and...

Estimating Hydroelectric Operation and Maintenance
To improve the estimating of operation and maintenance costs for new small hydroelectric projects, an estimating model was developed. This model listed all of the operation and maintenance...

The Gem State Hydropower Project
The Gem State Hydroelectric Project is located on the Snake River about 5 miles southwest of the City of Idaho Falls, Idaho. The project consists of a 40-foot high, 900-foot-long earth...

Dongjiang Project and Development of Lei River
Lei River in the south of Hunan Province is a tributary of Xiang River, flowing northward to the Yangtze River. Dongjiang has been selected as the key project to be constructed for hydropower...

A Mathematical Model for Traveling Screens at Hydropower Plants
Hydroelectric projects cause significant mortality to fish migrating downstream. The current method to reduce fish mortality at hydropower plants is the use of traveling screens. In this...

Design and Operation of a Differential Surge Tank
The differential type of surge tank is more effective in operation than the simple type because it reacts more quickly to load changes of all sizes. The differential tank is also usually...

Case Study: Siphon Penstock Operations
Hydroelectric power plants utilizing siphon penstocks operating near Winter, Wisconsin and at Jim Falls, Wisconsin have met or exceeded expectations after fine tuning of the vacuum and...

TBM Tunnel Friction Values for the Kerckhoff 2 Project
In the mid-1970's Pacific Gas and Electric Company began design of the Kerckhoff 2 Hydroelectric Project, which supplements the Kerckhoff 1 project built in 1919. The Kerckhoff...

Hydraulic Design and Performance of Discharge Facilities at Revelstoke Project
Revelstoke Project is located in southeastern British Columbia on the Columbia River, 130 km downstream of the Mica Dam and approximately 5 km north of the City of Revelstoke. The project...

The Role of Model Studies in Add-On Hydro Projects
The reasons for modeling add-on projects are reviewed, and guidance given for the process of determining, first, the need for modeling, and second, if modeling is necessary, whether physical...

Hydropower at Navigation Projects
Hydropower at navigation projects has been found to be compatible with the intended use of the project; however, it is important for the hydropower developer and the project owner to be...

Low Head Hydraulic Model Justifies Cost
In many cases, developers of low head hydroelectric plants fail to use physical hydraulic modelling as a tool in the design process. Economic constraints are often cited as the primary...

Flow Calculation in a Francis Runner
The flow through a Francis runner has been analysed theoretically. The flow calculations have been carried out by use of an inviscid 3D computational method solving the Euler-Equations....

Turbine Casing and Distributor Hydraulic Design
Interactive casing and distributor hydraulic design and flow analysis software has been developed and tested. Until now, its application is limited to radial distributor turbo-machines....

Pit Turbine Technology for Low Head Hydro Projects
Manufacturers of hydro generating equipment have developed designs that are adaptable to existing dams and suitable for upgrading and redevelopment of existing hydro plants. The pit turbine...

Optimisation of Bulb and Kaplan Turbine Runners
The paper presents a brief survey of the theoretical method used so far at Turboinstitut Ljubljana for axial runner design and analysis. Theoretically optimised runner is later experimentally...

Rehabilitation of a High Specific Speed Francis Turbine
An upgrade of two (2) 4. 06 meter diameter high specific speed Francis turbines is now in progress. These machines were originally installed by Allis-Chalmers in the 1920's...

 

 

 

 