Hydraulic Aspects of West Delaware Tunnel Hydroelectric Development
Construction of a 7,500 kilowatt hydroelectric plant at the end of a 70 kilometer long water supply tunnel posed unusual hydraulic conditions that needed special consideration. Cooperation...

A Rocky Mountain Project Intake/Discharge Channel Flow Simulation Study
A two-dimensional depth-integrated finite element flow model was applied to evaluate pumping and generating flow conditions at the Rocky Mountain Project powerhouse intake/discharge channel....

Physical Hydraulic Modeling for Construction of New York State Dam Hydroelectric Project
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into four main channels as the water...

Evaluation of Turbine Intake Velocity Criteria
The paper addresses the effect of intake flow distribution on turbine performance at low-head projects. Field and model test data are used to raise the question of whether typical turbine...

Frazil Ice Problems and Solutions at Hydro-Power Intakes
Active and passive frazil ice effects on hydroelectric plant intake design and operation are described and references are provided. The most frequently encountered problems and the basic...

Pressure Control Studies for PG&E's 20 MW Grizzly Hydroelectric Project
The Pacific Gas and Electric Company's Grizzly Hydroelectric Project consists of a single 20 MW Francis turbine under 700 feet head located near the existing Bucks Creek Project....

Manufacturing Planning 4 ? 440 MW Turbines Short Delivery
DBS Escher Wyss Inc. is building the largest turbines ever to be manufactured in Canada for the third expansion of the Tarbela project in Pakistan; four (4) Francis turbines each rated...

A Case Study, Large Versus Small
This paper will review the hydraulic comparisons between the Lock and Dam No. 13 Hydropower Project, a 33-MW, low-head generating station near Fort Smith, Arkansas, and the Murray Hydroelectric...

Sidney A. Murray, Jr. Hydroelectric Power Plant Turbine Hydraulic Design and Testing
This paper describes the project design concept, highlighting the choice of turbine type and capacity. Model testing and analysis of control by downstream gate is an important feature...

Operations and Maintenance Manual for Bradley Lake Hydroelectric Project
Bradley Lake Hydroelectric Project is located on the Kenai Peninsula of Alaska. The project consists of two 63 MVA turbine-generators fed via a single 3.5-mile-long penstock. The water...

Generation Control Methods for Operating Efficiency Improvement
One way to increase the energy production of a hydroelectric powerplant is to improve the power production efficiency, that is, obtain more energy for a given quantity of water through...

Dewatering Using a Floating Bulkhead Proves Flexible, Reusable and Cost Effective
Going beyond a traditional bulkhead dropped in place with a barge crane or crane hoist, a steel floating bulkhead was conceived to dewater powerplant intakes, gated spillway bays or outlet...

Composite Materials Show Promise for Clean Kaplan Runners
In order to prevent any possibility of oil leakage into river water, LMZ manufactured Kaplan runners containing oil in the blade servomotor only, while the blade operating mechanism operates...

Evaluation of Rehabilitation Alternatives for Small Hydropower Plants
This paper describes methods for comparative evaluation of alternative rehabilitation measures for aging small-scale hydroelectric power plants located on storage reservoirs. The evaluation...

The Unusual History of a Flowline Canal Within a Reservoir
This paper discusses the history of and remedial repairs to a flowline canal which carries water from the headwater of Lake Isabella in California to Southern California Edison Company's...

The Zebra Mussel Invasion Niagara Power Project
The zebra mussel is a prolific mollusk that has recently invaded the Great Lakes region. It has a proven track record for causing severe macrofouling at power utilities and water municipalities....

Robert Moses Procurement and Model Tests ? A Contractor's Perspective
This paper discusses (1) the need to provide realistic cost/benefit evaluation criteria in turbine bid specifications and (2) the benefits of competitive model testing. Recent procurement...

Ashton Hydroelectric Project Rehabilitation
This paper presents the project experience of rehabilitating the 70-year old Ashton power house and performing the dam design modifications to pass the increased probable maximum flood....

Dillon Hydroelectric Project Performance Versus Expectations
The Dillon Hydroelectric Project was commissioned in 1987. Design and construction are briefly described; plant availability is compared with design expectations; and maintenance costs...

The Twin Vortex Draft Tube Surge
Recent studies conducted at Colorado State University using a model of the 700-MW turbines at the U.S. Bureau of Reclamation's Grand Coulee Third Powerplant indicate that...

 

 

 

 

Return to search