Inspection Costs Versus the Benefits Derived
The following text describes the experiences of a small suburban municipality located in Middle Tennessee before, during and after a five-year program of comprehensive inspection and testing...

Masonry Rehabilitation: Practice and Research
The rehabilitation of masonry buildings is a major construction activity in the United States. The available techniques and evaluation methodologies are limited to visual investigation...

Analysis of Cracking of I79 Bridge at Neville Island
A large crack was discovered to form in a girder of the I-79 Glenfield Bridge over the back channel of the Ohio River near Pittsburgh on January 28, 1977. A section of the girder containing...

Structural Integrity Assessment of the Flexible 870 Advanced Design Bus
The Grumman Flxible 870, a lightweight advanced design urban bus, entered service in Atlanta, GA in 1978, and some 2,800 of these buses were in service nationwide by 1980. In the autumn...

Investigation of Catastrophic Failure of a Premium-Alloy Railroad Rail
In November 1983 an Amtrak train derailed at a speed of 72 mph (115 kph) at Woodlawn, Texas (in the vicinity of Marshall, Texas), resulting in four fatalities and twenty-four serious injuries....

Time-Dependent Damage and Creep of Brittle Rock
In this paper, some results of a combined analytical-experimental study of the relationship between subcritical microcrack growth due to stress corrosion and the time-dependent deformation...

Transmission Tower Foundations in Weathered Rock
A case history is presented which discusses the siting, design and construction of the tower foundations for a transmission line in southwest Alaska. The project, completed in 1983, consists...

The Role of Demand Forecasts in Pacific Northwest Power Planning
This paper has two primary objectives: to acquaint a general audience with the basic approaches used to forecast the demand for electricity, and to discuss the role of demand forecasts...

Hurricane Alicia
One Year Later
In the pre-dawn hours of August 28, 2983, Hurricane Alicia ripped its way ashore at the western tip of Galveston Island and moved northward to the Greater Houston area. This storm caused...

Composite and Mixed Construction
Steel and reinforced concrete are frequently combined in composite or mixed structural systems. This combination generally results isn greater economy and safety than could be achieved...

Control of the Design Process
Gilbert/Commonwealth, Inc. (G/C) was the architect-engineer for the original design of the Florida Power Corporation (FPC) Crystal River Nuclear Plant, Unit 3 (CR3) and has been involved...

Libby Rereg's Combined Spillway and Powerhouse
The existing powerhouse at Libby Dam, located near Libby, Montana has four generating units for a total of 420 MW. Provisions have been made which will allow doubling the plant rating...

New Exchequer Dam, California
New Exchequer Dam design, in 1963, was in the transition period in which dumped rockfill was being recognized as having undesirable settlement characteristics, and compaction of rockfill...

Design and Construction of Terror Lake Dam
Terror Lake Dam is a central feature of the 189 million Terror Lake Hydroelectric Project, located on Kodiak Island Alaska. The dam is a 193-feet (59 m) high concrete-faced zoned rockfill...

Design and Stability Evaluation of Balsam Meadow Dam
The proposed Balsam Meadow Dam is a 126 feet high concrete-faced rolled rockfill dam currently under construction for the Balsam Meadow hydroelectric project in California. Detailed field...

Low Cement Content High Strength Concrete
The fundamental objective of this research project was to develop mix design information for structural grade concrete using high fly ash content. The fly ash used in this project was...

Foundation Design Considerations for Detroit DPM
The design loadings for support of the elevated guideway of the Detroit Downtown People Mover (DPM) consist of high vertical as well as horizontal loads. In order to simplify foundation...

Applying an Automated Storage and Retrieval System to a Centralized Bus Maintenance Facility
Gannett Fleming recently completed the design of a new Central Maintenance Facility for the Southern California Rapid Transit District. An integral part of this facility is an automated...

Development of Flood Peak Regression Equatins for Small Watersheds in Southwest Florida
Hydrologic investigations were performed on the Belle Meade-Royal Palm Hammock area in Collier County, Florida. The study area, encompassing approximately 79 square miles (205 km**2),...

Salt Lake City Flood Experiences
Salt Lake City experienced snowmelt floods during 1983 and 1984. Peaks during these years were very high with many historic records being set in both years. Different and unique problems...

 

 

 

 

Return to search