Deep-Water Platform Solutions for the Navarin Basin
The environmental conditions prevailing in the Navarin Basin may impose limitations on the type and shape of production, storage and loading structures. The magnitude of the wind and wave...

Creep Rate Analysis of Pile Load Test Data
The uniform creep behavior of five driven piles and one slurried pile based on pile load test data are presented and analyzed. The incremental static load tests carried out by ARCO, Alaska...

Developing a Drilling Structure for Arctic Waters
Fluor-Doris of Houston has developed a mobile, composite concrete and steel drilling structure called the Arctic Composite Platform (ARCOP). This platform is capable of operations in water...

Ice Forces on Port Structures Resulting from Moving Ships
Results are described of experiments carried out in Thunder Bay Harbour in March, 1984, to measure ice forces on a port structure. Ice forces were measured by installing five pressure...

SAV Reestablishment Results?Upper Chesapeake Bay
In the Susquehanna Flats area of the upper Chesapeake Bay, six submersed aquatic plant species were used to test the feasibility of transplanting SAV into sites which were previously vegetated,...

Coastal Erosion's Impact on California Offshore Oil Development
Recent oil discoveries in the offshore Santa Maria Basin and the Santa Barbara Channel will require the construction of new oil facilities located along 90 miles of Santa Barbara County...

The Impact of Selected Sea Level Rise Scenarios on the Beach and Coastal Structures at Sea Bright, N.J.
The physical impacts of selected sea level rise scenarios on the shoreline of Sea Bright, New Jersey, are investigated. The sea level rise scenarios chosen for investigation were developed...

Maintaining a Natural Gas Pipeline in Active Landslides
This paper deals with a pipeline section on both sides of Douglas Pass in west Colorado. Landslide activity in the area has been causing considerable problems and disruptions of the pipe...

Quality Control Management of Real-Time Data
Recent improvements in the real-time acquisition of hydro-meteorological data have raised concerns regarding the quality of the data received. This paper presents several data verification...

MILHY?A Microcomputer Based Hydrologic and Hydraulic Model
MILHY is an interactive, single event, lumped parameter model used to estimate streamflows and water surface profiles. The model was designed for use on basins less than approximately...

Initial Operation Model for the Central Arizona Project
A microcomputer program for operating uncompleted portions of the Central Arizona Project has been developed. Engineers may use this program daily to assist in scheduling pumping plant...

Nuclear Power Plant Delays: Probable Causes and Resolutions
The nuclear power industry in the United States is experiencing technological as well as construction and operation problems in nuclear facilities. It is the intent of this paper to review...

Oconee Spent Fuel Rerack
Spent fuel storage problems facing electric utilities with nuclear generation are growing more critical as existing spent fuel storage capacity is utilized. Due to the inaccessibility...

Managing a New Start Rail Transit Agency
In 1982 the Southern California Rapid Transit District (RTD) was facing two major challenges. A Policy and Management Plan was developed to meet these two major challenges. The Policy...

Managing Major Transit Construction Projects
Building rapid transit systems is a regular and ongoing world wide occurrence. However, for cities initiating first time transit system development it is truly a unique experience. Initiating...

Coordination and Control - Staff, Consultants and Participating Agencies for Sacramento Light Rail Transit Project
The Sacramento Light Rail Transit Project is an 18. 3 mile (29. 5 Km) line, primarily at-grade, which provides the trunk line service for an integrated Bus/LRT public transportation system...

The Coordination Effort: Getting Through the Levels
This paper deals with the coordination and management of two major public transport projects in Portland, Oregon. It discusses the management process utilized in the planning and construction...

Effective Environmental Management: The Northeast Corridor Experience
The Northeast Corridor Improvement Project (NECIP) is a 2 billion public transportation project involving improvements to Amtrak's 456-mile main rail line between Washington,...

Planning Aspects of the Woodward Corridor LRT Preliminary Engineering Project
The efficient deployment of any major project requires careful planning of the management, scheduling and budgeting activities associated with its implementation. The Woodward Corridor...

Procurement of New Passenger Rail Cars from Japan
In May 1983 the California Department of Transportation (Caltrans) signed a contract with Sumitomo Corporation of America, in which Sumitomo agreed to furnish 63 new stainless steel gallery...

 

 

 

 