The Future of Non-Utility Generation
The business of designing, constructing and operating non-utility owned electric power plants continues to evolve into the 1990s. The industry is consolidating as smaller market participants...

Evaluating Advanced Technologies for Acid Rain Compliance
Technological innovation in emissions control of acid rain precursors has made possible increasingly stringent control requirements for coal-fired power plants. A key challenge for potential...

Screening Emissions Control Measures
Under the new Clean Air Act, electric utilities will be able to choose from a wider range of sulfur dioxide emissions control options than in the past. Among the newly available measures...

Introduction to Structural and Mechanical Failure Modes for Nuclear Power Facilities
The three papers presented in this section discuss the types of information (i.e., dynamic tests, earthquake experience and analytical data) which are used in predicting the capacity of...

Raising of an Ash Disposal Pond by Hydraulic Filling
Commercial and industrial development around existing power plant waste disposal sites often precludes the ability to expand these sites laterally. Limitations on land availability have...

Hydropower in the Upper Ohio River Basin: A Decade of Effort at Risk
The Federal Energy Regulatory Commission (FERC) issued licenses on September 27, 1989 for construction of 16 hydroelectric projects in the Upper Ohio River Basin after up to 8 years of...

Reviewing the History and Activity of FERC
Since passage of the Federal Water Power Act in 1920 (Part I of the Federal Power Act, 16 U.S.C. 791a et seq.), Congress has required those seeking to construct, operate, or maintain hydroelectric...

Environmental Aspects and Compliance Costs of Hydropower Regulation
Recent experiences by American Electric Power with respect to mitigation at hydroelectric project sites on the upper Ohio River indicate that compliance with environmental regulations...

The Changing Legal Structure of Non-Utility Generation in the 1990's
Before actual construction of a small power production or cogeneration facility commences, numerous economic, technical and legal factors have been considered during the planning process....

Facing the 21st Century with an Aging Hydro System
The Tennesse Valley Authority (TVA) has implemented a comprehensive study of their hydroelectric plants in order to extend their service life for the next 50 years into the 21st century....

Dam, Spillway and Hydropower Rehabilitation
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. Current deficiencies include deterioration of original construction...

Hydro Rehabilitation?Innovative Solutions
Most hydro facilities have been in operation for many years and, consequently, must periodically have been rehabilitated. The high cost of energy, labor, materials, and financing dictate...

Brule Project Spillway Rehabilitation and Expansion
Brule Hydroelectric Project is located near Florence, Wisconsin, on the Brule River about 1.5 miles upstream of its confluence with the Michigamme River. The 80 year old dam developes...

Automation of Union Electric's Hydro-Power Plants
Union Electric Company is spending twelve million dollars on Electronic Control and Monitoring equipment at two of their hydro-electric plants (a total of twenty-seven generating units)...

Nuclear Plant License Renewal: Benefits, Feasibility, and Process
The future of power plants in the U.S. is of growing concern. The need for competitively priced and economically safe plants is a must. The reluctance of the utility industry to produce...

Ash Disposal at Coal Creek Station
This paper outlines the effort of two utilities to minimize the impact of an 1100 megawatt lignite fired plant's waste stream on the environment. Current regulations, poor...

Failure Modes of Flat Bottom Vertical Storage Tanks
Flat bottom vertical storage tanks are important components in essential nuclear power plant safety systems. Data on the seismic capacity and failure modes of such tanks have been identified,...

Innovative Aspects of the DQE/GPU Project
The DQE-GPU joint project is an endeavor at supplying electricity to its customers in an economically competative way. The project cosists of using existing power stations in the Three...

First Update to the U.S. Nuclear Regulatory Commission's Regulatory Strategy for the High-Level Waste Repository Program
The U.S. Nuclear Regulatory Commission (NRC) staff has updated its initial regulatory strategy for the High-Level Waste Repository Licensing Program. The update describes changes to the...

Safety Assessment of Radioactive Waste Disposal: A Priority Area for International Co-operation Within the OECD Nuclear Energy Agency
The OECD/NEA programme in the radioactive waste management area gives a high priority to long-term safety aspects of radioactive waste disposal practices. Overall aims of this part of...

 

 

 

 