Economic factors of Hydro Plants Versus Fossil Plants for Load Frequency Control
The purpose of this study was to determine whether hydro plants with Francis turbines or fossil plants are more economical for load frequency control. Using data from the Tennessee Valley...
Power Value Determinations
Past and current federal methodology and procedures in power value determinations are presented for consideration by Western Area Power Administration (Western), U. S. Department of Energy...
Economic Evaluation of Alternative Electric Power Developments
A hydroelectric-dominated power system and a thermal-dominated system represent different ways of meeting total electric demand, but with materially different cash flow patterns. This...
An Overview of the Implementation of PURPA
In November of 1978, Congress enacted a major piece of legislation that started a new direction in how energy resources in this country would be developed in the next decade. The Act,...
Financing Hydro Projects
STS Consultants, Ltd. is a consulting engineering firm with expertise in the Hydraulics/Hydrology area. Boulevard Bank is a major commercial bank in Chicago, Illinois. This paper elaborates...
The Municipal Preference and Hydropower Project Finance
There is a continuing search for a way to combine private financing, using tax benefits provided under the Internal Revenue Code, with the municipal preference provided under the Federal...
Need for Power Analysis: The Technical, Economic, and Financial Interrelationships
The Susitna Hydroelectric Project is one of the largest hydroelectric projects to be brought before the Federal Energy Regulatory Commission (FERC) by an applicant seeking the issuance...
The Diamond Fork Power Development Experience
Federal water development agencies are, to varying degrees, currently seeking financing partnership arrangements with states and other non-federal entities for up-front construction and...
Financing the Town Bluff Hydropower Project
The Town Bluff Dam Hydropower Project is the first new Federal hydropower project to be completely financed by a non-Federal entity where all of the construction funds would be provided...
A Cost-Sharing Alternative for Federal-Private Water Projects
A proposed cost-sharing alternative for financing of a joint Federal-State multipurpose water project is presented. The philosophy of recent and present Federal administrations on non-Federal...
Eminent Domain Under the Federal Power Act: Use by Private Developers to Acquire Small Sites
From the first reported case in 1922 (Alabama Power Co. v. Gulf Power Co. , 283 F. 606 (D. Ala. 1922)), through 1982 (Greenup County By and Through Ousley v. Utilities Comm'n...
Commensurate with the Scope of the Project: Where Does the Project Environment End?
This paper seeks to contribute to a common understanding by considering the definition of project scope in the context of the Federal Energy Regulatory Commission regulations governing...
Kinetic Hydro Energy Conversion System Study
In early studies conducted at New York University (NYU) at the request of New York Power Authority (NYPA) a number of conclusions were reached regarding the resource and the types of kinetic...
Blue Marsh?A Modular Hydroelectric Project
The Blue Marsh Hydroelectric Project will be the first complete application of concepts developed in several research studies of modular hydroelectric power plant components. The Department...
Analysis and Testing of Transient Pressures at Camp Far West Hydroelectric Project
The objective of this paper is to present a comparative discussion of the results of theoretical analysis of transient pressures and of field tests performed on the Camp Far West Hydroelectric...
Design of the Tunnel System for the Terror Lake Hydroelectric Project
The Terror Lake Hydroelectric Project, Kodiak, Alaska, contains a 5-mile-long (8. 1 Km) power tunnel with supplementary stream diversions entering it by two shafts along its alignment....
Hoover Dam Plus Fifty Years Equals El Cajon Dam
The completion of El Cajon arch dam on the fiftieth anniversary of the completion of Hoover Dam has given the opportunity to compare design and construction of two concrete arch dams constructed...
Hoover Dam Earthquakes Reconsidered
In 1936 and 1937 as the water rose behind Hoover Dam, earthquakes were felt in the Boulder City area and as far away as Las Vegas. Interest in induced seismicity was renewed in 1967 with...
Nanpil River Hydropower Project Pohnpei, Federated States of Micronesia
The Nanpil River Hydropower Project is a 1600 KW run-of-the-river hydropower project located on the tropical island of Pohnpei, Federated States of Micronesia. The hydropower project will...
Changing Stability Criteria: Effect on Older Dams
Many of the dams on the Georgia Power Company system were designed and constructed in the early 1900's. Changes that have occurred in stability criteria since construction...
Return to search