Overview of Mathematical Models?River Nile/High Aswan Dam
This paper has been directed towards the presentation of seven reliable planning tools (mathematical models) that can be used for the investigation of the planning options facing policy...
Sacramento's Proactive Stormwater Permit Program
In January 1990, with the encouragement and assistance of the California Regional Water Quality Control Board-Central Valley Region (Regional Board), the City and County of Sacramento,...
Utilization of Stormwater Runoff to Recharge Underlying Aquifer
The expanding economy in Oman has led to rapid development in the Capital area. Water is critical to sustaining this rapid growth, and new sources of water are being sought to meet the...
Basin-Wide Stormwater Management in Pennsylvania?A Case Study of Hydrologic Performance Standards
Performance standards in the form of 'release rates' are developed using hydrologic computer models. This basin-wide approach to stormwater management considers...
Decoverly Lake?Functional Hydraulics & Aesthetics
The Decoverly Office Park is located in Rockville, MD. In 1984, engineering design on the seven office building park and pond was begun by the consulting engineers. From the beginning,...
The Piedra del Aguila Project Large Radial Gates
Piedra del Aguila Hydroelectric Project is on the Limay River in Argentina. It has a capacity of 1424 MW with annual energy of 5500 GWH. This is an overflow dam, with intake gates, penstocks...
Diversion Closure Gate Schemes Used on B.C. Hydro Dams
Over the last 25 years B.C. Hydro has designed, built and has operated a number of large dams and continues to do so. This paper describes the design, erection and operating experiences...
Hydrologic Aspects of Flood Warning?Preparedness Programs
A reliable flood-threat recognition system is a vital component of a sound flood warning-preparedness program. Fundamental questions associated with the development of a flood-threat recognition...
Slurry Removal From a 2-D Fluidized Region
A two-dimensional fluidization experiment is performed on fine sand with a 5.08 cm diameter source pipe with horizontally opposed orifices, 0.317 cm in diameter, spaced 5.08 cm. Slurry...
Urban Stormwater Quality Enhancement
Source Control, Retrofitting, and Combined Sewer Technology
This proceedings contains the papers presented at the Engineering Foundation Conference on Urban Stormwater Quality Enhancement - Source Control, Retrofitting and Combined Sewer Technology,...
Estuarine and Coastal Modeling
Microcomputer Applications in Transportation III
This proceedings consists of papers presented at the International Conference on Microcomputers in Transportation which was held on June 21-23, 1989 in San Francisco, California. They...
Computer Watersheds
As development extends further and population densities increase, old methods of stormwater management become obsolete. Runoff from one site can cause flooding elsewhere in a watershed;...
The Stacked Drift Tunnel
The Mount Baker Ridge Tunnel is the first of its kind and the last: a forward thrust of technology and a look back to the flow of federal highway funds, which paid 90% of its cost. The...
Top Projects 1990
A dam, a bridge, an expressway, an interchange, flood control improvements, wastewater treatment and a dredged material containment embankment round out the 1990 Outstanding Civil Engineering...
Advances in Pipeline Materials
Pipelines transport water, storm run-off, process wastes, petroleum, natural gas, slurries, solids, sewage, steam and other fluids either by gravity or under pressure. Pipelines are also...
Franchising for the Future
Franchising is no longer reserved for hamburger stands or quick print photo processors. Now engineers may decide to join lawyers and dentists in future franchise operations. In today's...
Lower Granite Fish Guidance Efficiency System Model Study?Snake River, Washington
With the annual migration of adult salmon up the Columbia and Snake Rivers and the migration of their offspring (juvenile salmon) downstream to the ocean, new problems have developed with...
Review of Garolim Tidal Power Project
The feasibility study of Garolim tidal power project made in 1981 was reviewed in 1986 and updated in 1988. The review study generally confirmed the result of the 1981 study. The generator...
Field Installation of Strain Gaged Geotextiles
High-strength polyester geotextiles were used in two major Corps of Engineers projects: Wilmington Harbor, Del. and New Bedford, Mass. To verify design assumptions and as part of monitoring...
Return to search