Geomorphic and Sedimentologic Evaluation of a Proposed Flood Control Project, Truckee River, Reno, Nevada
Geomorphic observations, sediment data and shear stress analyses were integrated to evaluate the potential responses of the steep, coarse grained Truckee River to a proposed flood control...
Evaluation of Streambank Erosion Control Demonstration Projects
The Streambank Erosion Control Evaluation and Demonstration (SECED) Act of 1974 (Section 32 of Public Law 93-251) was enacted by Congress to obtain information on costs and performance...
Hydraulic and Scour Analysis for Muitiple Crossings of the Salt River, Phoenix, Arizona
Two new freeway systems currently being designed for the Phoenix metropolitan area, the East Papago Freeway and the Outer Loop Highway, will both cross the Salt River within a one mile...
Streamflow Forecasting: Experiences in Development of Customized Systems for Hydropower Operations
Technical advances in computers and real time data acquisition favor the development of computer based streamflow forecasting systems. These technical advances should be combined with...
Corps of Engineers Sediment Management Program
The existing sediment management program includes sediment investigations of reservoir, river and levee projects; gathering and maintaining sediment load records; providing sediment investigation...
Major Sedimentation Issues for the USGS
Historically, sediment information has been used primarily in planning for engineering structures that were designed to meet a single or a very limited number of objectives. Today most...
Critical Flow Through Bridge Piers
A physical model study was performed at California State University, Long Beach to investigate the location of critical depth within bridge piers in supercritical lined channels. This...
Ring Gate as Turbine Emergency Shut-Down Device
The ring gate, intially used as a regulating device in the early stage of the design of hydraulic turbines, has grown to a reliable emergency shut-down device. Incorporated in the hydraulic...
Storm Water Management and Wetland Restoration?Ballona Channel Wetlands
A storm water management plan was engineered to provide storm water dention necessary for site develop and at the same time to allow wetland restoration. Objectives of the project were:...
Modelling of Stages of Nile River as a Tool for a Better Water Resources Management
As far as Egypt is concerned, the Nile is not just a river, it is rather the pulsing nerve of life. Consequently, it was essential to maintain detailed information about its levels and...
Overview of Mathematical Models?River Nile/High Aswan Dam
This paper has been directed towards the presentation of seven reliable planning tools (mathematical models) that can be used for the investigation of the planning options facing policy...
Sacramento's Proactive Stormwater Permit Program
In January 1990, with the encouragement and assistance of the California Regional Water Quality Control Board-Central Valley Region (Regional Board), the City and County of Sacramento,...
Utilization of Stormwater Runoff to Recharge Underlying Aquifer
The expanding economy in Oman has led to rapid development in the Capital area. Water is critical to sustaining this rapid growth, and new sources of water are being sought to meet the...
Basin-Wide Stormwater Management in Pennsylvania?A Case Study of Hydrologic Performance Standards
Performance standards in the form of 'release rates' are developed using hydrologic computer models. This basin-wide approach to stormwater management considers...
Decoverly Lake?Functional Hydraulics & Aesthetics
The Decoverly Office Park is located in Rockville, MD. In 1984, engineering design on the seven office building park and pond was begun by the consulting engineers. From the beginning,...
The Piedra del Aguila Project Large Radial Gates
Piedra del Aguila Hydroelectric Project is on the Limay River in Argentina. It has a capacity of 1424 MW with annual energy of 5500 GWH. This is an overflow dam, with intake gates, penstocks...
Diversion Closure Gate Schemes Used on B.C. Hydro Dams
Over the last 25 years B.C. Hydro has designed, built and has operated a number of large dams and continues to do so. This paper describes the design, erection and operating experiences...
Hydrologic Aspects of Flood Warning?Preparedness Programs
A reliable flood-threat recognition system is a vital component of a sound flood warning-preparedness program. Fundamental questions associated with the development of a flood-threat recognition...
Slurry Removal From a 2-D Fluidized Region
A two-dimensional fluidization experiment is performed on fine sand with a 5.08 cm diameter source pipe with horizontally opposed orifices, 0.317 cm in diameter, spaced 5.08 cm. Slurry...
Urban Stormwater Quality Enhancement
Source Control, Retrofitting, and Combined Sewer Technology
This proceedings contains the papers presented at the Engineering Foundation Conference on Urban Stormwater Quality Enhancement - Source Control, Retrofitting and Combined Sewer Technology,...
Return to search