Probabilistic Basis for Managing Maintenance
The paper discusses a procedure based on component failure probabilities, consequences of failure, and risk associated with loss of system. Aging effect of structures and equipment on...
Urban Drainage Pipe Systems: Failure Diagnosis and Rehabilitation Planning
A Task Committee on Failure Diagnosis and Rehabilitation of Urban Drainage Infrastructure has been organized by the Urban Water Resorces Committee of the Water Resourcs Planning and Management...
Retrofitting a Regional Stormwater Facility
The City of Tacoma, Washington, constructed a regional stormwater detention facility in the Leach Creek watershed in 1961 to permit development in the southwest corner of the City while...
Rehabilitation of Rapidly Urbanizing Streams
DuPage County, Illinois is implementing a stream maintenance program with the purpose of restoring and preserving the hydraulic efficiency of its streams and drainageways. The program...
Recognizing Institutional Barriers in Regionalizing Water Supply Infrastructure
The Northern Colorado Water Conservancy District (District) is conducting a study to determine the feasibility of implementing expanded regional cooperation for future municipal and industrial...
Willingness to Pay for Stormwater Infrastructure
The contingent valuation method is used to estimate the willingness of Baltimore County homeowners to pay for stormwater controls to reduce nutrient loadings to the Chesapeake Bay. Homeowner...
Stormwater Management: Detention in Illinois
In 1987 the Illinois Department of Transportation contracted the Northeastern Illinois Planning Commission (NIPC) to perform a study to determine the effectiveness of the current accepted...
Managing Water During Drought
In response to the problems that recent droughts have exposed, the Corps of Engineers is conducting the National Water Management During Drought Study. The primary purpose of the study...
Utilization of Stormwater Runoff to Recharge Underlying Aquifer
Based on the available data and its proximity to the Capital area, Wadi Al Khawd was selected as the site of the first aquifer recharge project in Oman. The project was designed by Stanley...
Financing Small Water Supply Projects in Colorado
In order to meet the water supply needs of Colorado communities and the requirements of the Safe Drinking Water Act of 1986, the Colorado Water Resources and Power Development Authority...
Capital Improvements Financing and Planning After a Natural Disaster
The Pima County Wastewater Department (PCWWMD) provides collection, treatment and disposal of wastewater in metropolitan Tucson, Arizona, and various outlying areas. In October 1983, severe...
Water Utility Demand Forecasting Using Lotus 1-2-3 Spreadsheet
In this study, a technique has been developed using Lotus 1-2-3 spreadsheet for distributing projected populations to small sectors throughout the study area. This procedure divides the...
Preliminary Report of the Feasibility of an Interbasin Water Transfer Through Existing Canal Systems
A preliminary feasibility study of the interbasin transport of water from the Sabine River on the Texas Louisiana border to the San Jacinto River Basin, northeast of Houston, Texas, using...
Sediment Management Challenges of the Red River Waterway Project
The Red River Waterway project consists of channel stabilization and construction of navigation locks and dams to provide a 9 foot minimum depth for a distance of approximately 236 miles,...
Appropriate Cost Factors for System Reliability
This paper examines the development of appropriate costs to be associated with various levels of failure of water distribution networks and water supply systems. A clear distinction is...
Developing a Wastewater Plan for an Urbanizing Area?The Case of Johnson County, Texas
Johnson County, Texas, is located south of Ft. Worth, Texas, and is influenced by the entire Dallas-Ft. Worth Metroplex, which has a population of more than 3 million people. In 1988 the...
Financing Water Supply and Wastewater Facilities in Low Income Areas
The Texas Water Development Fund was created by amendment to the Texas Constitution in 1957 as a reaction to the droughts of the 1950's. Subsequent amendments to the Texas...
The Spirit of Bandera?An Experiment in Inter-Agency Team-Building
An experiment to improve intergovernmental cooperation in water resources planning and management was initiated by the Southwestern Division, U.S. Army Corps of Engineers, in 1988 at Bandera,...
Conservation and Water Supply Planning at Army Installations
The purpose of this paper is to summarize the research being conducted by the U.S. Army Institute for Water Resources in providing technical assistance to the Installation Planning Division,...
A Travel Time Template for Water Body Field Surveys
A LOTUS 1-2-3 spreadsheet application has been developed to help plan water body surveys. The template calculates travel times between sampling stations and outputs a time schedule for...
Return to search