Unique Features of Automated People Mover Systems
This paper identifies the characteristics and unique features of the automated transit system presently being installed in the central business district of Detroit, Michigan. This system...

Downtown People Mover System Security: Detroit and Miami Responses
The Detroit and Miami downtown people mover (DPM) systems will be in uncontrolled environments in major urban central business districts. Both plan not to have personnel on vehicles or...

Human Interface Design of an APM Control Center
The control center of an Automated People Mover (APM) system is a man-machine system. Both software and hardware aspects of the design of the monitor room that directly affect ease of...

Detroit's DPM Maintenance and Control Facility
The Maintenance and Control Facility (MCF), a single building complex for the Detroit Downtown People Mover (DPM) system, incorporates the people mover system's transit vehicle...

Downtown People Mover Operating and Maintenance Personnel Requirements
Two major automated Downtown People Mover (DPM) projects, Miami and Detroit, are expected to be in operation within a year. These two DPM systems are similar in many respects: automation,...

Maintenance Requirements of People Mover Systems
The Atlanta Airport Automated Guideway Transit System is comparable to the second or third busiest transit line in the US. The key quality indicators of system performance are discussed...

Toward User-Oriented Failure Management Strategies for the Morgantown People Mover
The Morgantown People Mover (MPM) is the most sophisticated automated people movers in the United States. It is the only one that offers 'personalized' service...

Information Availability
There seems to be a great deal of concern about lack of availability of information concerning the results of failure investigations. In most court cases there is virtually no technical...

Failure Information Needs in Civil Engineering
If we are to learn from failures of engineered facilities, failure information must be in a useful form, and it must reach those who can effect improved practice. This paper discusses,...

The WMATA Resident Engineer?The Team He Leads and His Responsibilities
This paper discusses the role of the Resident Engineer as a key member of any construction team. It uses the organization and functions as practiced at the Washington Metropolitan Area...

The Resident Engineer?A Member of the Construction Team
The paper discusses the prime concern of a resident engineer, namely, seeing to it that the structure built is in accordance with the plans and specifications and that the work is carried...

The Resident Engineer as Construction Team Member
The success of a construction project is affected by the actions of the resident engineer (RE). Good REs don't come off the street; they are developed through training and...

The Role of the V.A. Resident Engineer
The Resident Engineer plays a vital part on the Veterans Administration construction team. He serves as a hub for communications between the various members of the team as well as the...

The Resident Engineer?Staffing the Team
One of the initial actions a Resident Engineer (RE) must grapple with each time he begins a new construction project is how to staff his construction team. The balancing of the type and...

Construction Scheduling for Public Sector Projects
The paper presents some types of scheduling systems that are utilized in Postal Service projects as well as the advantages and disadvantages of each. It is suggested that schedule approval...

Computer Keeps New Orleans: Head Above Water
The city of New Orleans has been beset with drainage problems since its founding in 1718. A major drainage system was installed in the city in the late 1800s, but it has grown increasingly...

Drainage Tunnels Save Freeway Link
A 15 mile section through downtown Phoenix will complete Interstate 10. After years of delay, the project is now close to completion. The project required construction of 6.5 miles of...

Small Water Users�Planning Crisis
Planning to rehabilitate small water systems�both irrigation and municipal water supply�often is ignored. In contrast, planning for new construction and for operations/maintenance work...

Insulative Lightweight Concrete for Building Walls
Research is currently being conducted to develop a portland cement concrete for use in low-rise building walls that will combine the structural, thermal insulating, and heat storage capacity...

Decision Support System for Tunneling
This paper first discusses methodologies for considering geological uncertainty in tunneling projects and for determining the most economic excavation and support methods under such condition;...

 

 

 

 

Return to search