Effect of Planning Errors on Construction Safety
A discussion of the planning phase of the building process associated with all the activities that are accomplished during this phase is presented. The different types of errors that occur...

Eliminating Bias in Construction Schedules to Measure Time
Schedules developed for use in managing the construction process which are accurate for that use are not necessarily sufficiently accurate to measure and evaluate delays and changes to...

Project Control Via Acoustical Sensing
This paper describes ongoing research into automating the process of collecting project control information using acoustical sensing devices. The paper describes how frequency spectra...

The WMATA Resident Engineer and the METRO Construction Team
This paper discusses the organization, mission and functions of the Resident Engineer and the other construction elements of the Washington Metropolitan Area Transit Authority (WMATA)....

Decision Support System for Achieving and Measuring Design Effectiveness
A microcomputer program is developed to serve as a decision system for improving design effectiveness. The program, called 'Design Effectiveness Evaluation and Implementation...

The Jet Set
The new maintenance hangar now nearing completion at Charlotte/Douglas International Airport has aluminum standing seam roofing. The unusual material was specified because every ounce...

Building Onto History
In a single design/build/renovation project, an Oklahoma City AE firm acquired new offices, provided new life for an abandoned historic church building and spearheaded redevelopment of...

Bells Under Bells
Chicago's newest office tower is supported on new bells that had to be constructed below existing belled caissons. Existing caisson foundations from a previous structure on...

Specifications for Masonry Structures
Specifications for Masonry Structure (AC1530.1-88/ASCE6-88) is a joint effort of the American Concrete Institute and the American Society of...

Building Code Requirements for Masonry Structures (ACI 530-88/ASCE 5-88) and Specifications for Masonry Structures (ACI 530.1-88/ASCE 6-88) (ACI 530.1-88/ASCE 6-88)
Copublished with the American Concrete Institute (ACI) Building Code Requirements for Masonry Structures and Specifications for...

Classic Wood Structures
Wood has been used in a wide range of structural applications. When properly maintained, these structures can have a useful life from 50 years to several centuries. Thirty-seven unusual...

Pumped-Storage: An Analysis of Optimal Capacity
This paper presents a systems analysis procedure to evaluate planning alternatives for pumped-storage operated in an existing power system. This procedure can be used by planners and engineers...

Federal Vs. Non-Federal Hydroelectric Development
This paper presents the methodology and results of economic and financial analyses that were performed to indicate the optimum size powerplants that would be constructed assuming Federal...

Actual Vs. Expected Performance of Small Hydro Projects
This paper presents the results of several case studies of small hydro projects that compare the expected performance with the actual performance as measured in terms of energy generation....

The Uses of CADD in Hydropower Development
The hydropower community needs inexpensive methods to thoroughly and quickly analyze the siting of hydroelectric projects. Computer-aided design and drafting (CADD) and programs like HYSIZE...

Small Hydro Analysis and Reporting Program
The Ontario Ministry of Energy initiated a project to develop an analysis program based upon metric measures and Canadian costs. The Ministry of Energy of the Province of Ontario has been...

Spreadsheet Applications for Hydropower Developers and Operators
This paper will examine the role of spreadsheet analysis in all aspects of hydropower development. The structure of the presentation will be first to briefly present an overview of the...

Cumulative Impact Assessment: Application of a Methodology
The authors expanded upon the Federal Energy Regulatory Commission's (FERC) Cluster Impact Assessment Procedure (CIAP) to provide a practical methodology for assessing potential...

Glen Canyon Environmental Studies Resource Response Analysis
The primary objective of the Glen Canyon Environmental Studies is to determine how the resources of the Grand Canyon respond to the operations of Glen Canyon Dam. Two levels of analysis...

Systems Analysis for Fisheries Protection and Mitigation at Corps of Engineers Columbia River Dams
Pacific Northwest anadromous salmon and steelhead that migrate to and from the ocean are greatly affected by the numerous Columbia and Snake River dams they have to pass, first downstream...

 

 

 

 

Return to search