Rocky Mountain Project?Overview
The Rocky Mountain Project, in Northwest Georgia, will be a three unit hydroelectric pumped-storage project with 850,000 kW installed in an above ground powerhouse. The gross water volumes...

Hydraulic Model Studies?Pak Mun Hydroelectric Project (Thailand)
The paper presents briefly the hydraulic problems related to the project which were successfully solved by the 1 to 100 scale hydraulic model study carried out at the Asian Institute of...

Hydraulic Aspects of West Delaware Tunnel Hydroelectric Development
Construction of a 7,500 kilowatt hydroelectric plant at the end of a 70 kilometer long water supply tunnel posed unusual hydraulic conditions that needed special consideration. Cooperation...

Physical Hydraulic Modeling for Construction of New York State Dam Hydroelectric Project
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into four main channels as the water...

Pressure Control Studies for PG&E's 20 MW Grizzly Hydroelectric Project
The Pacific Gas and Electric Company's Grizzly Hydroelectric Project consists of a single 20 MW Francis turbine under 700 feet head located near the existing Bucks Creek Project....

Manufacturing Planning 4 ? 440 MW Turbines Short Delivery
DBS Escher Wyss Inc. is building the largest turbines ever to be manufactured in Canada for the third expansion of the Tarbela project in Pakistan; four (4) Francis turbines each rated...

A Case Study, Large Versus Small
This paper will review the hydraulic comparisons between the Lock and Dam No. 13 Hydropower Project, a 33-MW, low-head generating station near Fort Smith, Arkansas, and the Murray Hydroelectric...

Sidney A. Murray, Jr. Hydroelectric Power Plant Turbine Hydraulic Design and Testing
This paper describes the project design concept, highlighting the choice of turbine type and capacity. Model testing and analysis of control by downstream gate is an important feature...

Operations and Maintenance Manual for Bradley Lake Hydroelectric Project
Bradley Lake Hydroelectric Project is located on the Kenai Peninsula of Alaska. The project consists of two 63 MVA turbine-generators fed via a single 3.5-mile-long penstock. The water...

Dardanelle Turbines
The Dardanelle turbines located at river mile 205.5 of the McClellan-Kerr Arkansas River Navigation System, are experiencing an unusual amount of wear in the blade trunnion bushings. Oil...

The Zebra Mussel Invasion Niagara Power Project
The zebra mussel is a prolific mollusk that has recently invaded the Great Lakes region. It has a proven track record for causing severe macrofouling at power utilities and water municipalities....

Robert Moses Procurement and Model Tests ? A Contractor's Perspective
This paper discusses (1) the need to provide realistic cost/benefit evaluation criteria in turbine bid specifications and (2) the benefits of competitive model testing. Recent procurement...

Ashton Hydroelectric Project Rehabilitation
This paper presents the project experience of rehabilitating the 70-year old Ashton power house and performing the dam design modifications to pass the increased probable maximum flood....

Dillon Hydroelectric Project Performance Versus Expectations
The Dillon Hydroelectric Project was commissioned in 1987. Design and construction are briefly described; plant availability is compared with design expectations; and maintenance costs...

Development of an Eicher Screen at the Elwha Dam Hydroelectric Project
The Eicher Screen is a relatively new concept for screening juvenile fish out of hydroelectric turbine penstocks. The concept was developed by Mr. George Eicher and one was recently installed...

Fish Bypass System Mathematical Models
Mathematical models for fish diversion systems based on fish behavior in conjunction with diversion system structural and hydraulic properties are developed. Guidance efficiency is described...

Hydroacoustic Evaluation of Deep and Shallow Spill as a Bypass Mechanism for Downstream Migrating Salmon at Rock Island Dam on the Columbia River
Hydroacoustic data were collected on downstream migrating juvenile salmon (Oncorhynchus spp.) during the springs of 1983 and 1984, and summer 1990 at Rock Island Dam on the Columbia River...

Design Concepts for Vertical Kaplan Turbines
In this paper, some general aspects as well as selected design details of vertical Kaplan turbines are presented. The Monroe Street project which is under construction right now serves...

Rocky Mountain Pump-Turbines and Related Mechanical Equipment
The Rocky Mountain powerplant will have three reversible, single stage, vertical shaft pump-turbine units, each having a maximum output of 321 MW generating and a maximum pumping capacity...

Decision Support for Colorado River Operations
The United States Bureau of Reclamation (Reclamation) uses a simulation model known as the 24-month Study Model for planning monthly and seasonal operations for the Colorado River Basin....

 

 

 

 