Retrofitting a Regional Stormwater Facility
The City of Tacoma, Washington, constructed a regional stormwater detention facility in the Leach Creek watershed in 1961 to permit development in the southwest corner of the City while...

Rehabilitation of Rapidly Urbanizing Streams
DuPage County, Illinois is implementing a stream maintenance program with the purpose of restoring and preserving the hydraulic efficiency of its streams and drainageways. The program...

Recognizing Institutional Barriers in Regionalizing Water Supply Infrastructure
The Northern Colorado Water Conservancy District (District) is conducting a study to determine the feasibility of implementing expanded regional cooperation for future municipal and industrial...

Legal Issues Presented by the Regionalization of a Water System
The joint development of a water supply and related infrastructure ('regionalization') by independent municipal and private entities presents legal and institutional...

Incentives for Regionalization of Water Supply Infrastructure
Regionalization of water supply entails an agreement between two or more previously independent water suppliers wherein regionalization offers each something more than they could obtain...

Willingness to Pay for Stormwater Infrastructure
The contingent valuation method is used to estimate the willingness of Baltimore County homeowners to pay for stormwater controls to reduce nutrient loadings to the Chesapeake Bay. Homeowner...

Stormwater Management: Detention in Illinois
In 1987 the Illinois Department of Transportation contracted the Northeastern Illinois Planning Commission (NIPC) to perform a study to determine the effectiveness of the current accepted...

Managing Water During Drought
In response to the problems that recent droughts have exposed, the Corps of Engineers is conducting the National Water Management During Drought Study. The primary purpose of the study...

Utilization of Stormwater Runoff to Recharge Underlying Aquifer
Based on the available data and its proximity to the Capital area, Wadi Al Khawd was selected as the site of the first aquifer recharge project in Oman. The project was designed by Stanley...

Financing Small Water Supply Projects in Colorado
In order to meet the water supply needs of Colorado communities and the requirements of the Safe Drinking Water Act of 1986, the Colorado Water Resources and Power Development Authority...

Capital Improvements Financing and Planning After a Natural Disaster
The Pima County Wastewater Department (PCWWMD) provides collection, treatment and disposal of wastewater in metropolitan Tucson, Arizona, and various outlying areas. In October 1983, severe...

Developing a Privately Owned Utility in Florida: Financing and Cash Flow
Private developers of a 5,000-acre master-planned community in Sarasota, Florida, were required to provide their own wastewater treatment plants as a condition for obtaining permits. After...

An Analysis of the Impact of Weather Variation on Monthly Water Demand
A methodology is utilized to analyze and model the impact of weather variation on monthly long distance water deliveries in Southern California. Monthly water demand is viewed as a combination...

Water Utility Demand Forecasting Using Lotus 1-2-3 Spreadsheet
In this study, a technique has been developed using Lotus 1-2-3 spreadsheet for distributing projected populations to small sectors throughout the study area. This procedure divides the...

The Multi-Watfore Method: A Water Demand Forecasting System
The multi-Watfore method, which combines the cascade model and a first order analysis of uncertainty, is a system of practical steps to develop models of water demand while generating...

Preliminary Report of the Feasibility of an Interbasin Water Transfer Through Existing Canal Systems
A preliminary feasibility study of the interbasin transport of water from the Sabine River on the Texas Louisiana border to the San Jacinto River Basin, northeast of Houston, Texas, using...

A Water Pricing Model for Lake Texana
Faced with water sales and recreation revenues insufficient to service the project debt, the Lavaca-Navidad River Authority (L-NRA), operators of Lake Texana, decided upon a novel approach...

Appropriate Cost Factors for System Reliability
This paper examines the development of appropriate costs to be associated with various levels of failure of water distribution networks and water supply systems. A clear distinction is...

The Development of Lake Granbury SWATS Regional Electrodialysis Reversal Demineralizer Treatment Plant
Due to high population growth and rapidly declining groundwater levels, the Brazos River Authority of Texas initiated a regional study to evaluate existing and potential surface water...

Developing a Wastewater Plan for an Urbanizing Area?The Case of Johnson County, Texas
Johnson County, Texas, is located south of Ft. Worth, Texas, and is influenced by the entire Dallas-Ft. Worth Metroplex, which has a population of more than 3 million people. In 1988 the...

 

 

 

 

Return to search