No. 1 Water Wheel Project, Gilman, Vermont
This paper describes the replacement of an old generating unit with a new unit in a turn-of-the-century mill building where three other such units were already operating. The key issues...
Hydropower Goes Downtown
Beneath a busy street in Southern California seems an unlikely location for a small hydroelectric generating plant. However, located just below El Segundo Boulevard in the town of El Segundo...
After L'Ambiance Plaza
In the aftermath of the tragic collapse of the L'Ambiance Plaza apartment building at Bridgeport, Conn., in April 1987, reforms are being proposed. In 1987 ASCE approved writing...
The European Underground
Three tunneling projects in Europe are described: a tunnel bored under two rivers in Lyon, France, a subway station constructed as a mined tunnel in Vienna, Austria and a tunnel mined...
Grout Supports Brooklyn Tunneling
At the Red Hook project in Brooklyn, microfine cement grout was injected from the surface to support underground tunneling. The hand-dug tunnel was built to connect to sewer pipes. Subsurface...
Planning, Design and Cost Estimates for RCC Dams
Engineers, planners, and officials of agencies responsible for developing water resource projects are confronted with preparing preliminary designs and cost estimates for dams. This paper...
Cedar Falls Roller Compacted Concrete Dam
This paper presents the design, material testing, quality control, and construction considerations applicable to a small Roller Compacted Concrete (RCC) dam. The Cedar Falls RCC dam is...
Behavior of Completed RCC Dams
Enough roller compacted concrete dams have been completed to allow an overall evaluation of this new approach to construction. Performance has been good. No operational restrictions have...
Strengthening and Raising Gibraltar Dam with RCC
The initial phase of a multiphase investigation program was completed by USBR (U. S. Department of the Interior, Bureau of Reclamation) personnel to develop geotechnical laboratory testing...
Compaction Parameters of Roller Compacted Concrete
Density in roller compacted concrete is usually achieved through vibratory compaction. Factors of major influence in attaining densification of a structure with a vibrating roller are...
Comparison of Joint Shear Strengths for Conventional and Roller Compacted Concrete
Direct shear test data for parent material and bonded and unbonded jointed specimens of conventional and RCC (roller compacted concrete) are presented and compared. Results are discussed...
Roller Compacted Concrete Mix Design for Pamo Dam
Pamo Dam is designed as a 265 foot (81M) high gravity dam that will be located on the Santa Isabel Creek in San Diego County, California. RCC volume will be approximately 491,000 cubic...
Monksville Dam: Design Evolution and Construction
This paper documents the application of experience gained at other RCC projects to the Monskville Dam. The evolution of the design and its translation to construction are presented together...
Quality of Works in RCC in France: A Contractor's Solution
Bec Freres S. A. , a French dam contractor, introduced the technique of roller compacted concrete (RCC) into France. The first two French RCC dams were built as a result of a program of...
RCC in Dams in Australia
The design, construction and performance of the first three dams constructed in Australia, using RCC are described. Aspects covered in the paper include designing for zero cohesion between...
Proportioning RCC Pavement Mixtures
The U. S. Army Corps of Engineers has begun using roller compacted concrete for construction of heavy-duty pavements and low volume streets and roads which are exposed to low-speed tracked...
Corps of Engineers Experience with RCC Pavements
Roller compacted concrete pavements were first developed in the U. S. by the Corps of Engineers in 1975. Since that time, RCC pavements have been constructed throughout much of the U....
Evaluating Sinkhole Hazards in Mantled Karst Terrane
Sinkholes are the most serious geologic hazard in karst terrane because they can damage structures, drain ponds and lakes, and allow direct infiltration of groundwater contamination. The...
Geophysical Exploration for Cavity Detection in Karst Terrain
Detection of poor quality rock and voids has been a major research activity of the U. S. Army Engineer Waterways Experiment Station (WES) since the mid 1970's. The principal...
Exploration of Karst Conditions in Central Florida
Walt Disney World, which comprises some 28,000 acres (11,000 ha) in central Florida, is underlain by cavernous limestone and is characterized by karst topography; with distinct low ground...