Roof Membranes: New Systems, New Problems
Market trends in roof membranes are described; most important is the use of single-ply membranes of rubber or plastic in the past decade. A swing to modified bitumen membranes is predicted...

Electronic Computation
The papers included in this book were presented during the thirteen sessions of the Ninth ASCE Conference on Electronic Computation. Topics addressed represent a wide spectrum of computer...

Cold Regions Engineering
Engineers who plan, design, construct, operate and maintain facilities in cold regions must deal with all the concerns found in the more temperate areas of the world in addition to the...

Pavement?An Integral Part of the Terminal as a Container Handling System
A modern container terminal requires extensive areas of paving for stacking and moving containers, the provision of which often proves to be one of the most expensive single items, in...

Construction Approaches to the Navy's Floating Pier Concept
The subject of this paper is a floating pier which is currently under evaluation as a more cost-effective solution for berthing Navy ships. This new approach to pier design was sponsored...

Pavement Design for a Break Bulk Terminal Yard
This paper discusses the practical application of mechanistic pavement design principles for a proposed 8. 1 ha break bulk cargo storage yard that is part of the Port of Portland's...

Tacoma Sea-Land Terminal: A Project Management Challenge
The Port of Tacoma completed a new two berth container terminal and intermodal yard for Sea-Land in May 1985 in only 26 months after signing a binding agreement. The project, which also...

Tacoma Terminals Pier Designed for Economy
This pier is a representative and highly refined sample of what is known as the Puget Sound system of construction, an economical system that maintains the durability necessary in the...

Carnation Terminal, Oakland?Preliminary Design
The Preliminary Design process is examined as it was applied to design of wharves for a new container terminal in the Port of Oakland, California. The process includes active interdisciplinary...

Designing Marinas to Mitigate Impacts
The John Wayne Marina was permitted for construction only after certain design features were altered to accomodate major biological and water quality concerns. The moorage basin was relocated...

Research on the Strength Characteristics of Timber Piling
Research on the strength characteristics of wet Southern Pine and Douglas Fir piling and poles is presented. Included are background information on wood's strength characteristics,...

Efficiency Gains Using Micro Computers in Marina Design Engagements
This paper addresses improved efficiency in marina design engagements using low cost micro computers and low cost software. From the preparation of an offer for service, through design,...

Structural Design of Container Cranes
The shipping industry uses container cranes to move cargo containers on and off ships. Container cranes have characteristics common to all crane structures, but many characteristics are...

Geotechnical Aspects of Waterfront Parks: Case Histories
This paper presents several case histories of waterfront developments, and describes the general approach that the geotechnical consultant should take in the design of these projects....

South Beach Harbor Project: Redevelopment of the San Francisco Waterfront
The redevelopment of a portion of San Francisco's Northern Waterfront is recounted, describing the planning and design process used to take an area of obsolete maritime facilities...

Modern Inspection Techniques n Port Maintenance
This paper addresses inspection of underwater structure of port facilities to acquire information which, when subjected to engineering analysis and confirmation, allows planning of short...

Development of Prestressed Concrete Fender Piles
An ongoing effort is reported to develop prestressed concrete fender piles for use in a wide range of pier fendering applications. Preliminary analysis and testing results indicate that...

Lessons Learned from the Certification of Graving Docks, Marine Railways, Vertical Lifts and Shipbuilding Ways
Because of the hazards which exist during the ship docking, undocking, launching and while the ship is being built or repaired, the Navy has determined a requirement exists for system...

Notes on Geotechnical Input to the Design of Graving Drydocks
These notes discuss geotechnical considerations in the design of graving drydocks, in particular the floors and walls of the structure. The effect of ground-water conditions in the design,...

Geotechnical Considerations in the Design of the Wando Terminal Wharf Extension, Charleston, South Carolina
The South Carolina State Ports Authority (SPA) is currently examining construction concepts for the proposed 1,200-foot wharf extension and 40 acres of adjacent upland development at the...

 

 

 

 